首页
登录
职称英语
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2024-01-16
49
管理
问题
Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings(雕刻) above the Queen Street entrance were actually caricatures(漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch (拱门), and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall."
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
(80)The entire structure cost more than $2. 5 million to build at the time. This is equal to $ 53 million today. [br] Which of the following statements is TRUE according to the passage?
选项
A、To build a structure like the City Hall will cost $2. 5 million today.
B、The clock tower stands parallel with the centre of the City Hall.
C、Old City Hall was once pulled down in the development of the city.
D、Old City Hall is now a historical site.
答案
D
解析
综合分析题。题干问的是“根据文章,下列哪项是正确的?”根据定位句“这相当于今天的5300万美元。”(A项不符);“钟楼与贝街中心点平行,而不是与市政厅的中心平行。”(B项不符);“…老市政厅面临着被拆除的危险。”(C项不符);“老市政厅在1989年被认定为历史遗迹。”(D项符合)。综合分析可知,答案中只有D项是符合文中原义的,故选D。
转载请注明原文地址:https://tihaiku.com/zcyy/3366077.html
相关试题推荐
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
随机试题
ThelateAustrianphilosopherLudwigWittgensteinoncesaidthatthemeaning
Fromthetestimonyemergesaman______deviousandhonest,vulgarandgallant,
关于多协议标记交换(三层交换)技术,下面的描述中正确的是()。A.标记是一个固
下列关于可摘局部义齿设计的要求,哪项是错误的:A.采用分散(牙合)力设计,减轻基
患者,男性,78岁。蛛网膜下腔出血3天,现患者对强烈痛刺激有反应,基本生理反应存
不属于国际金融监管体系的组织是()。A.巴塞尔银行监管委员会 B.国际证
急性肾小球肾炎临床治愈的主要指标是A.水肿消失 B.肉眼血尿消失 C.自觉症
患者,男性,35岁。两周来右侧后牙咬物不适,喝热水引起疼痛。近3天来,夜间痛影响
(2020年真题)2019年12月31日,某企业E商品账面余额为3000000元
根据2017版红皮书通用条件中关于质量管理的规定,如果未能通过竣工试验,工程师可
最新回复
(
0
)