Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar

游客2024-01-16  7

问题     Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
    Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
    Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings(雕刻) above the Queen Street entrance were actually caricatures(漫画) of councilors at the time.
    Lennox even included himself in the caricatures, on the west side of the central arch (拱门), and left a strange signature in the stonework of the link portions of the building.
    The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
    When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall."
    The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
    (80)The entire structure cost more than $2. 5 million to build at the time. This is equal to $ 53 million today. [br] Which of the following statements is TRUE according to the passage?

选项 A、To build a structure like the City Hall will cost $2. 5 million today.
B、The clock tower stands parallel with the centre of the City Hall.
C、Old City Hall was once pulled down in the development of the city.
D、Old City Hall is now a historical site.

答案 D

解析 综合分析题。题干问的是“根据文章,下列哪项是正确的?”根据定位句“这相当于今天的5300万美元。”(A项不符);“钟楼与贝街中心点平行,而不是与市政厅的中心平行。”(B项不符);“…老市政厅面临着被拆除的危险。”(C项不符);“老市政厅在1989年被认定为历史遗迹。”(D项符合)。综合分析可知,答案中只有D项是符合文中原义的,故选D。
转载请注明原文地址:https://tihaiku.com/zcyy/3366077.html
最新回复(0)