首页
登录
职称英语
Toronto’ s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’ s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2024-01-14
17
管理
问题
Toronto’ s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings above the Queen Street entrance were actually caricatures (漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch, and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the " Friends of Old City Hall. "
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
The entire structure cost more than $ 2.5 million to build at the time. This is equal to $ 53 million today. [br] The third City Hall is now used as a______.
选项
A、middle school
B、hospital
C、cinema
D、courthouse
答案
D
解析
细节题。定位到文章第五段可知,第三市政厅原先是作为市议员办公处和法律官员办公处使用的,但今天只作为法庭使用。故选D。
转载请注明原文地址:https://tihaiku.com/zcyy/3362816.html
相关试题推荐
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthene
W:Operator,Iwanttomakeaperson-to-personcalltoToronto,Canada.Thenumbe
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
AfterbeingtestedinmanyWays,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
随机试题
[originaltext]Whereistheseafoodrestaurantpeopleherelikemost?[/originalt
Johnhadnotmuchaffectionforhismotherandsisters,andanantipathytom
Electronictrash,knownase-waste,ispilingupfasterthaneverinAmerica
患者,女性,65岁。一日测量口温时不慎咬破体温计,不妥的做法是A.立即洗胃 B
甲建设单位与乙勘察设计单位签订了勘察设计合同。合同约定,设计费为150万元,定金
下列关于平台闪络保护动作后,处理原则正确的有()。记录串补装置平台闪络电流值$;
与传统的专家判断法和信用评分模型相比,违约概率模型能够直接估计客户的违约概率。(
在WAIS-RC的实施中,仅按反应的质量给予不同的分数的分测验包括()。
患者46岁,右侧腮腺反复肿大两年,自述每于进食时右侧腮腺憋胀感,并伴轻微疼痛,晨
某公司2020年度实现会计利润总额25万元。经税务师审核,“财务费用”账户中列支
最新回复
(
0
)