首页
登录
职称英语
Toronto’ s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’ s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2024-01-14
30
管理
问题
Toronto’ s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings above the Queen Street entrance were actually caricatures (漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch, and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the " Friends of Old City Hall. "
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
The entire structure cost more than $ 2.5 million to build at the time. This is equal to $ 53 million today. [br] The third City Hall is now used as a______.
选项
A、middle school
B、hospital
C、cinema
D、courthouse
答案
D
解析
细节题。定位到文章第五段可知,第三市政厅原先是作为市议员办公处和法律官员办公处使用的,但今天只作为法庭使用。故选D。
转载请注明原文地址:https://tihaiku.com/zcyy/3362816.html
相关试题推荐
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthene
W:Operator,Iwanttomakeaperson-to-personcalltoToronto,Canada.Thenumbe
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
AfterbeingtestedinmanyWays,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
随机试题
Hisheavydrinkingandfondofgamblingmakeshimapoorrolemodel.A、andfactt
[originaltext]W:Goodeveningandwelcometotonight’sprogram,Ourguestisth
某公司的质量目标是每千行代码缺陷数不大于2.5个,项目组为确保目标的达成,并对软
患者,女性,50岁。反酸嗳气2年,恶心、呕吐2个月。呕吐物为宿食,不含胆汁,体重
合同履行期间,因人工、材料、工程设备和机械台班价格波动影响合同价格时,人工、机械
根据Q/GDW10231-2016无人值守变电站技术导则,关于断路器和隔离开关
董事长应当自接到提议后()日内,召集和主持董事会会议。A:7 B:10 C:
《预算法》第六十四条规定,各级预算预备费的动用,由()提出。A.本级政府 B
(2017年真题)某药品零售企业陈列商品的做法,错误的是( )A.毒性中药品种
导致钻孔灌注桩施工中断桩的原因有()。A.集料级配差,混凝土和易性差而造成离析卡
最新回复
(
0
)