Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar

游客2024-01-16  24

问题     Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
    Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
    Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings above the Queen Street entrance were actually caricatures (漫画) of councilors at the time.
    Lennox even included himself in the caricatures, on the west side of the central arch, and left a strange signature in the stonework of the link portions of the building.
    The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
    When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall."
    The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
    The entire structure cost more than $ 2.5 million to build at the time. This is equal to $ 53 million today. [br] Toronto’s third City Hall came into use in______.

选项 A、the 18th century
B、the 19th century
C、the 20th century
D、the 21st century

答案 B

解析 细节题。定位到文章第一段可知,多伦多第三市政厅于1899年9月18日开放,即市政厅是在1899年投入使用的。1899年属于19世纪,故选B。
转载请注明原文地址:https://tihaiku.com/zcyy/3366804.html
最新回复(0)