首页
登录
职称英语
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2024-01-16
25
管理
问题
Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings above the Queen Street entrance were actually caricatures (漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch, and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall."
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
The entire structure cost more than $ 2.5 million to build at the time. This is equal to $ 53 million today. [br] The third City Hall is now used as a______.
选项
A、middle school
B、hospital
C、cinema
D、courthouse
答案
D
解析
细节题。定位到文章第五段可知,第三市政厅原先是作为市议员办公处和法律官员办公处使用的,但今天只作为法庭使用。故选D。
转载请注明原文地址:https://tihaiku.com/zcyy/3366806.html
相关试题推荐
Whynothaveanewmachinedesigned?—______.I’llhavesomeonedoitsoon.A、I
W:Operator,Iwanttomakeaperson-to-personcalltoToronto,Canada.Thenumbe
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthe
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
AfterbeingtestedinmanyWays,thisnewly-designedmachinewill______inthen
随机试题
PlanningaWritingLessonI.Whatisagenre—variousin
[originaltext]Moderator:Hello,ladiesandgentlemen.Itgivesmegreatple
______howtodealwiththetroubleofthecomputer,Martinhadtoaskhisbroth
对不可恢复的线型感温火灾探测器,无法模拟火灾和故障,检查探测器能否发出火灾报警和
承载板法测试回弹模量试验的测试步骤如下。(2)用承载板测试土基回弹模量,在逐级加
关于普通合伙企业的合伙人资格,下列说法中,错误的有()。A.国有独资公司不
某混凝土试块强度值不满足规范要求,但经法定检测单位对混凝土实体强度经过法定检测后
2019年5月,全国12358价格监管平台受理价格举报、投诉、咨询共计37576
某房地产经营项目每年的净现金流量如下表所示,其投资回收期为()年。A:3 B:
28岁初产妇,妊娠40周,于晨4时临产,13时宫口开大4cm,21时30分宫口开
最新回复
(
0
)