首页
登录
职称英语
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2024-01-16
32
管理
问题
Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings(雕刻) above the Queen Street entrance were actually caricatures(漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch (拱门), and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall."
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
(80)The entire structure cost more than $2. 5 million to build at the time. This is equal to $ 53 million today. [br] From the passage we learn that______.
选项
A、Toronto spends lots of money yearly developing the city
B、some local residents showed a great interest in protecting the city’s cultural site
C、the City Council of Toronto hasn’t paid sufficient attention to the protection of the city’s culture
D、the City Hall is still the largest city building in North America today
答案
B
解析
细节题。题干问的是“从文中,我们可得知什么?”根据定位句“…这座市政厅被称为‘老市政厅之友’的群体拯救了。”可知B项是正确的。A项“多伦多每年花大量的钱来发展城市”,文中没有提及;C项“多伦多市政府对城市文化的保护没有给予足够的重视”,这与倒数第二段最后一句将老市政厅列为历史遗迹不符;D项“今天,市政厅仍是北美最大的城市建筑”,第二段中提到老市政厅曾经是北美最大的市政建筑,但对今天的情况并没有提到。综合考虑,故选B。
转载请注明原文地址:https://tihaiku.com/zcyy/3366076.html
相关试题推荐
Whynothaveanewmachinedesigned?—______.I’llhavesomeonedoitsoon.A、I
—Whynothaveanewmachinedesigned?—______.I’llhavesomeonedoitsoon.A、I
Thesebooksaredesignedto______children.A、agreewithB、applyforC、addressto
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
AfterbeingtestedinmanyWays,thisnewly-designedmachinewill______inthen
随机试题
[audioFiles]2016m8x/audio_ezfj_ezflisteningd_201607_036[/audioFiles]Father’
(1)Youdonotneedtoplayinabandtobepartoftheburgeoning"gigecono
Thewordconservationhasathriftymeaning.Toconserveistosaveandprot
扣件进入施工现场应检查产品合格证,并应进行抽样复试,技术性能应符合现行国家标准《
毫米波疗法治疗作用包括A.可达深层肌肉 B.产生温热效应 C.只达皮下脂肪、
甲房地产经纪公司(以下简称甲公司)所处城市近年来经济发展迅速,外来务工人员和个体
托尔斯泰说:“如果一个教师把热爱事业和热爱学生结合起来,他就是一个完美的教师。”
(2016年真题)抵押品的可接受性不包括()。A.抵押品种类 B.抵押品
投资项目决策分析与评价的基本要求包括贯彻落实科学发展观、资料数据准确可靠和()
医疗机构施行特殊治疗,无法取得患者意见又无家属或者关系人在场,或者遇到其他特殊情
最新回复
(
0
)