首页
登录
职称英语
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2024-01-16
69
管理
问题
Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings(雕刻) above the Queen Street entrance were actually caricatures(漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch (拱门), and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall."
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
(80)The entire structure cost more than $2. 5 million to build at the time. This is equal to $ 53 million today. [br] Old City Hall was constructed in______years.
选项
A、3
B、7
C、9
D、11
答案
D
解析
细节题。题干问的是“老市政厅修建了多少年?”根据定位句“…建设周期更长达11年”可知,共花了11年。故选D。
转载请注明原文地址:https://tihaiku.com/zcyy/3366074.html
相关试题推荐
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthe
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
AfterbeingtestedinmanyWays,thisnewly-designedmachinewill______inthen
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthe
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
随机试题
[img]2011q1/ct_etoeiclm_etoeiclzp_0401_2010126[/img][br][originaltext](A)Th
Therearefourbasictypesofcompetitioninbusinessthatformacontinuum
[originaltext]Inmychildhoodhome,dinnerwasenjoyedwithhushedvoices,
不要管其他人怎样想,作为一个个体,这是一个你必须自己做的选择。(regardlessof)Thisischoiceyouhavetomakefo
TherecessionistakingaserioustollonAmericanretail,bute-commerceco
建筑施工特种作业人员应当参加年度安全教育培训或者继续教育,每年不得少于()学时
贷款人受理借款人贷款申请后,应履行尽职调查职责,对个人贷款申请内容和相关情况的(
根据中国证监会、住房城乡建设部《关于推进住房租赁资产证券化相关工作的通知》,下列
下列有关审计质量控制的措施中,属于对审计作业过程进行控制的有( )。A.审核审
一住店客人未付房钱即想离开旅馆去车站。旅馆服务员揪住他不让走,并打报警电话。客人
最新回复
(
0
)