The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such , the schedule is used by the project management team to()A.Measure, delay, record, distribute, analyze, and directB.Plan, schedule, monitor, control, report, and forecastC.Promote, highlight, monitor, control, forecast, and reportD.Emphasize, visualize, analyze, conceptualize, report and record
选项
A.Measure, delay, record, distribute, analyze, and direct
B.Plan, schedule, monitor, control, report, and forecast
C.Promote, highlight, monitor, control, forecast, and report
D.Emphasize, visualize, analyze, conceptualize, report and record
答案
B
解析
项目进度计划不只是一个列出项目规定活动的时间表,而且还是一个用于决策的工具。如:进度计划可以被项目管理团队用来(73)。A.检测,延时,记录,分发,分析和直接B.计划,日程安排,监督,控制,报告和预测C.提升,亮点,监视,控制,预测和报告D.重点化,可视化,分析,概念化,报告和记录
转载请注明原文地址:https://tihaiku.com/congyezige/2299760.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
Thecustomerasksyourprojecttobecom
Inprojectmanagementandsystemsengine
Inaprojectplan,whentheprojectmana
( )isaprojectmanagementtechniquefo
Ascheduleiscommonlyusedinprojectp
TheProjectManagementTriangleisamod
Inprojectmanagement,a( )isalisto
Theprojectbudgethasbeenfinalized.Ad
Aprojectmanageriscalledtoaninform
Theprojectscheduleismorethanadocu
随机试题
[originaltext]OPEChasdecidedthiswasnotthetimeforcuttingpetroleum
[originaltext]Somediseasesareinfectious—likecoldsandfluButwhatabou
Then,whydoAmericanswanttoworkharder?Onereasonmaybethatthereal
Thereisnodoubtaboutit:theEarthreallyisgrowingwarmer.Ifyoulive
牙龈瘤的组织来源为A.牙周膜 B.牙槽骨 C.牙龈上皮 D.颌骨骨皮质
我国癌症的危险因素有()。A.吸烟 B.乙型肝炎病毒及其他病毒感染 C.膳食
影响人力资源需求预测的一般因素:
A.α受体阻断药 B.不属于交感神经抑制药 C.β受体阻断药 D.交感末梢
过敏性疾病、皮肤病与寄生虫病可呈现A.淋巴细胞增多 B.单核细胞增多 C.中
劳动关系的运行主要包括()的内容。A.组织机构与相互关系 B.关系处理的规则
最新回复
(
0
)