The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such, the schedule is used by the project management team to( ).A.measure, delay, record, distribute, analyze, and directB.plan, schedule, monitor, control, report, and forecastC.promote, highlight, monitor, control, forecast, and reportD.emphasize, visualize, analyze, conceptualize, report, and record
选项
A.measure, delay, record, distribute, analyze, and direct
B.plan, schedule, monitor, control, report, and forecast
C.promote, highlight, monitor, control, forecast, and report
D.emphasize, visualize, analyze, conceptualize, report, and record
答案
B
解析
项目计划包括了多个文件,规定了在一段时间内的活动,代表该项目的时间进度,它是一种管理工具,用于决策。因此,项目管理团队使用进度计划于
A、措施、延迟、记录、分发、分析、直接
B、方案、计划、监测、控制、报表、预测
C、促进、突显、监测、控制、预测,报表
D、强调、可视化、分析、概念化、报表、记录
转载请注明原文地址:https://tihaiku.com/congyezige/2302230.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
Theproject()processesinclude:dev
Inprojecttimemanagement,activitydef
ProjectIntegrationManagementincludes
( )isaprojectmanagementtechniquefo
Toensuretheprojectteamprovidesthe
Ascheduleiscommonlyusedinprojectp
Establishingaproject( )involveslis
TheProjectManagementTriangleisamod
Inprojectmanagement,a( )isalisto
Aprojectmanageriscalledtoaninform
随机试题
Thefollowingisalistofcollegecourses.Afterreadingit,youarerequiredt
Theprincipalcharacterinoppositiontotheheroorheroinofanarrativeordr
AWelcomingSpeechWriteawelcomingspeechofabout50-60wordsbasedo
患者,女,胸痛10天后来院就诊,心电图检查正常,怀疑为急性心肌梗死,检查一系列生
应急人员在一次应急事件中,眼晶体的受照剂量不得超过()Sv。A.0.25
贝克曼梁法适用于土基厚度不小于()的粒料整层表面的回弹弯沉值,通过计算求得该材料
反映土中水充满孔隙程度的指标是()。A.含水率 B.孔隙率 C.孔隙比 D
劳动保障部门应当自受理工伤认定申请之日起( )内作出工伤认定。A.30日 B
信托与委托的区别表现在()。A.成立条件不同 B.名义不同 C.权限不同
关于SAS,正确说法包括()多选A.属于他评量表 B.评定最近一周的实际感觉
最新回复
(
0
)