问题
The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such, the schedule is used by the project management team to( ).A.measure, delay, record, distribute, analyze, and directB.plan, schedule, monitor, control, report, and forecastC.promote, highlight, monitor, control, forecast, and reportD.emphasize, visualize, analyze, conceptualize, report, and record
选项
A.measure, delay, record, distribute, analyze, and direct
B.plan, schedule, monitor, control, report, and forecast
C.promote, highlight, monitor, control, forecast, and report
D.emphasize, visualize, analyze, conceptualize, report, and record
答案
B
解析
项目计划包括了多个文件,规定了在一段时间内的活动,代表该项目的时间进度,它是一种管理工具,用于决策。因此,项目管理团队使用进度计划于
A、措施、延迟、记录、分发、分析、直接
B、方案、计划、监测、控制、报表、预测
C、促进、突显、监测、控制、预测,报表
D、强调、可视化、分析、概念化、报表、记录
转载请注明原文地址:https://tihaiku.com/congyezige/2302230.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
Theproject()processesinclude:dev
Inprojecttimemanagement,activitydef
ProjectIntegrationManagementincludes
( )isaprojectmanagementtechniquefo
Toensuretheprojectteamprovidesthe
Ascheduleiscommonlyusedinprojectp
Establishingaproject( )involveslis
TheProjectManagementTriangleisamod
Inprojectmanagement,a( )isalisto
Aprojectmanageriscalledtoaninform
随机试题
(1)MostadultsintheU.S.whoscreenpositivefordepressionarenotbeing
Pen-palLetters:TheCross-curricularExperienceIasked
汇率超调
A.L平行于π B.L在π上 C.L垂直于π D.L与π斜交
表2016年国家自然科学基金 {图3} 在8个科学部中,教育部隶属单
2011年全国共发生各类地质灾害15664起,其中,滑坡11490起、崩塌231
某企业是一家食品生产商,其产品销售渠道有便利店、超级市场等。该公司对库存进行控制
(2018真题)某服装加工厂,共4层,建筑高度23m,呈矩形布置,长40m,宽2
着色牙漂白常用的过氧化氢的浓度是A.15% B.1% C.2% D.3%
可撤销的建设工程施工合同,有权撤销的机构是()。A.人民法院 B.建设行政主管
最新回复
(
0
)