首页
登录
从业资格
The project schedule is more than a docu
The project schedule is more than a docu
练习题库
2022-08-02
124
问题
The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such, the schedule is used by the project management team to( ).A.measure, delay, record, distribute, analyze, and directB.plan, schedule, monitor, control, report, and forecastC.promote, highlight, monitor, control, forecast, and reportD.emphasize, visualize, analyze, conceptualize, report, and record
选项
A.measure, delay, record, distribute, analyze, and direct
B.plan, schedule, monitor, control, report, and forecast
C.promote, highlight, monitor, control, forecast, and report
D.emphasize, visualize, analyze, conceptualize, report, and record
答案
B
解析
项目计划包括了多个文件,规定了在一段时间内的活动,代表该项目的时间进度,它是一种管理工具,用于决策。因此,项目管理团队使用进度计划于
A、措施、延迟、记录、分发、分析、直接
B、方案、计划、监测、控制、报表、预测
C、促进、突显、监测、控制、预测,报表
D、强调、可视化、分析、概念化、报表、记录
转载请注明原文地址:https://tihaiku.com/congyezige/2302230.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
Theproject()processesinclude:dev
Inprojecttimemanagement,activitydef
ProjectIntegrationManagementincludes
( )isaprojectmanagementtechniquefo
Toensuretheprojectteamprovidesthe
Ascheduleiscommonlyusedinprojectp
Establishingaproject( )involveslis
TheProjectManagementTriangleisamod
Inprojectmanagement,a( )isalisto
Aprojectmanageriscalledtoaninform
随机试题
Thatremarkablegoosewouldlay______everyday.[br]Atlasthisgooseis______
在中国,水稻生产是国民经济的重要组成部分。中国人早在公元前4000年就开始了水稻种植,而后逐渐传播到世界各地。目前,中国是世界上最大的水稻生产国,水稻产
[originaltext]W:WhatIwouldsuggestisespeciallystartingout,thatis,doin
回车坡道一般布置在()入口处。A.住宅室内外高差较大时 B.大型公共建筑
能够反映体内叶酸贮存情况的是()。A.红细胞中叶酸含量 B.血浆同型半
游客因其个人要求得不到满足而提出离团要求,导游人员正确的做法是()。A.配合领队
联合国教科文组织在《学会生存》的报告中指出:“人的创造力,是最容易受文化影响的能
有关血小板致密颗粒的描述不正确的是A:比α颗粒小B:每个血小板中有4~8个C
影响货车周转时间的主要因素有()。A.全周转距离 B.货车性能指标 C.旅
头痛多在一侧的是A.丛集性头痛 B.高血压病 C.青光眼 D.蛛网膜下腔出
最新回复
(
0
)