问题
The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such, the schedule is used by the project management team to( ).A.measure, delay, record, distribute, analyze, and directB.plan, schedule, monitor, control, report, and forecastC.promote, highlight, monitor, control, forecast, and reportD.emphasize, visualize, analyze, conceptualize, report, and record
选项
A.measure, delay, record, distribute, analyze, and direct
B.plan, schedule, monitor, control, report, and forecast
C.promote, highlight, monitor, control, forecast, and report
D.emphasize, visualize, analyze, conceptualize, report, and record
答案
B
解析
项目计划包括了多个文件,规定了在一段时间内的活动,代表该项目的时间进度,它是一种管理工具,用于决策。因此,项目管理团队使用进度计划于
A、措施、延迟、记录、分发、分析、直接
B、方案、计划、监测、控制、报表、预测
C、促进、突显、监测、控制、预测,报表
D、强调、可视化、分析、概念化、报表、记录
转载请注明原文地址:https://tihaiku.com/congyezige/2302230.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
Theproject()processesinclude:dev
Inprojecttimemanagement,activitydef
ProjectIntegrationManagementincludes
( )isaprojectmanagementtechniquefo
Toensuretheprojectteamprovidesthe
Ascheduleiscommonlyusedinprojectp
Establishingaproject( )involveslis
TheProjectManagementTriangleisamod
Inprojectmanagement,a( )isalisto
Aprojectmanageriscalledtoaninform
随机试题
[originaltext]M:Marcy,fromthisconversationaloneitbecomesapparentthaty
Thedifferencebetweenaliquidandagasisobvious【C1】______theconditions
ShanxiprovincenurturesanancientcivilizationinthemidsectionoftheYe
三级视力残疾的视力视野状况是()。A.无光感~<0.02;或视野半径<5度 B
手足心汗出量多是因为()A.阳经郁热 B.阴虚 C.气虚 D.阴经郁
(2017年)下列指标中,不能反映企业偿付长期债务能力的是()。A.利息保障倍数
试验制剂AUC与下列哪一项的比率称为相对生物利用度A:口服制剂AUCB:静脉注
项目计划成本的编制依据是()。A.投标价 B.合同价 C.预算
#_4与提问都是精细加工策略。
对于新建客运专线车站大号码道岔,宜采用的铺设方法是()。A.原位组装铺设
最新回复
(
0
)