首页
登录
职称英语
Toronto’ s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’ s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2024-01-14
20
管理
问题
Toronto’ s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings above the Queen Street entrance were actually caricatures (漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch, and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the " Friends of Old City Hall. "
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
The entire structure cost more than $ 2.5 million to build at the time. This is equal to $ 53 million today. [br] Old City Hall was constructed in______years.
选项
A、3
B、7
C、9
D、ll
答案
D
解析
细节题。定位到文章第三段第一句“Lennox took three years to design the City Hall and it took 11 years to build it.”可知,Lennox花了三年时间设计了市政厅,花了11年时间才建成,即市政厅的建设周期长达11年。故选D。
转载请注明原文地址:https://tihaiku.com/zcyy/3362815.html
相关试题推荐
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthene
W:Operator,Iwanttomakeaperson-to-personcalltoToronto,Canada.Thenumbe
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
AfterbeingtestedinmanyWays,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
随机试题
Whichofthefollowingstatementsdoesthespeakersupport?[br][originaltext]
Poetrycanbecomparedtopainting.Whenyoulookataworkofart,youfir
Afriendofmine,inresponsetoaconversationwewerehavingabouttheinj
当地基中塑性展开区最大深度等于1/3或1/4基础宽度,此时对应的荷载称为()
A.甲氨蝶呤 B.阿糖胞苷 C.长春新碱 D.环磷酰胺 E.柔红霉素会引
据抽样调査,上海市城市居民家庭人均可支配收入构成情况及部分城市城镇居民家庭人均可
下列各方组成药物中不含生姜的是()A.小青龙汤 B.真武汤 C.温经汤
2017年8月,某公司与杨某签订了为期2年的劳动合同。合同期满,双方续签2年。2
外感病变化加重的形式是A.虚实转化 B.寒热转化 C.表病入里 D.六经传
(2019年真题)关于深基坑土方开挖采用冻结排桩法支护技术,下列说法正确的是()
最新回复
(
0
)