问题
he Perform Integrated Change Control process is conducted from project inception through completion and is the ultimate responsibility of the ().A.Change control boardB.Project management officeC.Project managerD.Configuration management officer
选项
答案
C
解析
项目整体变更控制流程贯穿于项目开始到项目完成的各阶段,并且最终是()的职责。A.变更控制委员会B.项目管理办公室C.项目经理D.配置管理员
转载请注明原文地址:http://tihaiku.com/congyezige/2301720.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
Workperformanceinformationiscirculat
ThePerformIntegratedChangeControlpr
ThePerformIntegratedChangeControl
ThePerformIntegratedChangeControl
PerformQualityControlistheprocesso
TheperformIntegratedChangeContorlpr
Youhavejusttakencontrolofaproject
Changesmayberequestedbyanystakehol
Iftheapprovedchangerequestshavean
Yourhavejusttakencontrolofaprojec
随机试题
Peoplecanbeaddictedtodifferentthings—e.g.alcohol,drugs,certainf
Idecidedtostopandhavearest,______Iwasfeelingverytired.A、moreoverB、
THREETHEORIESABOUTORIGINOFL
Withoutreadingtherequiredbooksbeforeclasses,studentswillfinditdifficu
下列关于编辑加工整理步骤的表述,错误的是()。A.实施步骤要在抽读的基础上进行
决定短期债券持有期年均收益率的主要因素有()。A.票面利率 B.持有期限 C
许多抗原称为胸腺依赖性抗原,是因为A、在胸腺中产生的 B、相应抗体是在胸腺中产
下面哪个药物是抗生素类的抗结核药A.乙胺丁醇 B.对氨水杨酸钠 C.吡嗪酰胺
根据贷款方式、借款人信用等级、借款人的风险限额等确定可否贷款、贷款结构和附加条件
根据《建设工程施工合同(示范文本)》(GF-1999-0201),合同双方可约定
最新回复
(
0
)