首页
登录
从业资格
If the approved change requests have an
If the approved change requests have an
练习题库
2022-08-02
53
问题
If the approved change requests have an effect on the project scope,then the corresponding component documents and cost baselines,and( )of the project management plan are revised and reissued to reflect the approved changes.A.developing baselines B.testing baselines C.schedule base lines D.ending baselines
选项
A.developing baselines
B.testing baselines
C.schedule base lines
D.ending baselines
答案
C
解析
如果批准的变更请求对项目范围的影响,那么相应的组件文件和成本基线,和进度基线的项目管理计划。修订再版反映批准的变更。(75) A.发展基线 B.测试基线 C.进度基线 D.结束基线
转载请注明原文地址:http://tihaiku.com/congyezige/2296001.html
本试题收录于:
高级信息系统项目管理师题库软件水平考试初中高级分类
高级信息系统项目管理师
软件水平考试初中高级
相关试题推荐
( )istheapprovedversionofthetime-
ThePerformIntegratedChangeControlpr
hePerformIntegratedChangeControlpro
ThePerformIntegratedChangeControl
ThePerformIntegratedChangeControl
TheperformIntegratedChangeContorlpr
Iftheapprovedchangerequestshavean
Changesmayberequestedbyanystakehol
Iftheapprovedchangerequestshavean
Changesmayberequestedbyanystakehol
随机试题
Questions16-22•Readtheadvertisementbelowabouthealthinsurance.
Dinosaurswerereptileswhichbecameextinctabout65millionyearsago.The
Theconcernthroughouttheworldin1988forthosethreewhalesthatwereloc
Thewaysinwhichsocietiesaddressenvironmentalissuesareinthemidstof
简述著作权归属的一般原则
15,5,3,5/3,()A.9/5 B.27/5 C.15/9
在正态分布下,平均数上下1个标准差。包括总面积的( )A.68.2% B.9
农业在社会主义国民经济发展中起( )作用。[江苏省农村信用社真题]A.决定
某上市银行职员李某与另一家上市银行的职员王某在一次聚会中认识.作为银行业人员.他
关于BRMS评定时间的正确说法包括()A.一次评定约需20分钟 B.再次评定
最新回复
(
0
)