首页
登录
职称英语
The economic costs of noise to society are several. Airports are currently op
The economic costs of noise to society are several. Airports are currently op
游客
2024-05-31
42
管理
问题
The economic costs of noise to society are several. Airports are currently op-
erating at less than capacity because of noise regulations, which restrict their 【S1】______.
hours of operation. For instance, at Washington’s national airport no jet traffic is
allowed from 11 p. m. to 7 a. m. Other airports restrict the use of certain run-
ways. One estimated is that noise restrictions reduce possible airport use by 20 【S2】______.
percent. The profitable cargo trade is especially affected by night restrictions.
In the case of airports, jet engines may be modifying to reduce their noise lev- 【S3】______.
el, or insulation (隔音) from air traffic noise may be provided by the purchasing 【S4】______.
of land around airports. It is estimated that $ 5.7 billion would be required to
equip all existing jet engines for noise control devices. However, 【S5】______.
consider the current state of the art, even taking this step will not reduce noise 【S6】______.
levels at all points to acceptable values. Some combination of methods is proba-
bly necessary.
If all aircraft are made quieter by existing methods, there would be a number 【S7】______.
of economic benefits. An increase in airport capacity would occur. Property val-
ues near airports might rise. Transportation costs to and from airports could be
increased since the airports now could be located closer to population centers. 【S8】______.
Much research still needs to be done on the economic aspects of noise re-
duction and noise effects. Although some of the effects of noise pollution are
known, more must be discovered about their effects on health, productivity, prop- 【S9】______.
erty values and the quality of life. Furthermore. the cost of noise pollution to the
economy as a whole needs to be investigated.
The public must be alert about the dangers and economic costs of noise poi- 【S10】______.
lution so that people may make intelligent choices and exert appropriate pres-
sures. [br] 【S2】
选项
答案
estimated→estimate
解析
词性误用。此处根据句子成分one estimate应该做句子的主语,因此estimate应当为名词词性。如果estimate选择动词词性,则后面应当接宾语从句而非表语从句。
转载请注明原文地址:https://tihaiku.com/zcyy/3613452.html
相关试题推荐
Anindustrialsociety,especiallyoneascentralizedandconcentratedastha
Anindustrialsociety,especiallyoneascentralizedandconcentratedastha
Anindustrialsociety,especiallyoneascentralizedandconcentratedastha
Itistimethewholesocietybegantotakeactionto___________________________
Popularideologicalassumptionsaboutsocietychangewiththedecades,asw
Popularideologicalassumptionsaboutsocietychangewiththedecades,asw
Theeconomiccostsofnoisetosocietyareseveral.Airportsarecurrentlyop
Theeconomiccostsofnoisetosocietyareseveral.Airportsarecurrentlyop
Theeconomiccostsofnoisetosocietyareseveral.Airportsarecurrentlyop
Theeconomiccostsofnoisetosocietyareseveral.Airportsarecurrentlyop
随机试题
[originaltext]M:Honey,thesecondhalfofthebasketballgameisabouttostar
Ourgovernmentrecentlyhasfocusedontheimportanceofinvestmentinclean
关于水喷雾灭火系统手动控制方式的说法正确的是()。A.当火灾探测器发出火警信号
患者,女,23岁。痛经9年,经行不畅,小腹胀痛,拒按,经色紫红,夹有血块,血块下
普拉西坦是一种改善记忆、抗健忘的中枢神经兴奋药,其结构简式如图l所示。下列关于普
下列有关我国审计机关公布审计结果的表述中,正确的有( )。A.审计机关依法实行
右边四个图形中,只有一个是由左边的四个图形拼合(只能通过上、下、左、右平移)而成
教育的本质特征是( )。A、社会活动 B、人类社会的活动 C、人类自发的活
下列常见PPP模式中,用于新建项目,融资、工程建设和服务的有()。A、BTOB
在采用平行结转分步法计算成本时,以下表述正确的有()。A.上一步骤的生产费用
最新回复
(
0
)