首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2023-07-31
26
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway. The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, to check and to collect them when people leave the trains. This is all different of the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms. On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots". The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot send no signals, the train will stop. Most of the control work is done by computers. The computers also fix the train’s speeds and send the signals to the command spots. Other machines make sure that the trains are always a safe distance apart. If one train stays too long at a station, the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、It will stop automatically.
B、It will move on at the same speed.
C、It will gradually slow down.
D、It will keep a safe distance from the other trains.
答案
A
解析
[听力原文]
If no signal is sent from the command spot, what will happen to the train?
由选项推测本题考查it发出的动作。本题关键句为“If the command spot send no signals,the train will stop”,如果控制台没有信号列车将停止,故正确答案为A)。
转载请注明原文地址:https://tihaiku.com/zcyy/2885928.html
相关试题推荐
[originaltext]Smartphonesdistractattentionandreducelearningbecauseof
[originaltext]Goodafternoon.Intoday’slecture,we’llbetalkingaboutho
[originaltext]Goodafternoon.Intoday’slecture,we’llbetalkingaboutho
[originaltext]Everyoneissupposedtocheerforgoodguys,andweshouldon
[originaltext]Everyoneissupposedtocheerforgoodguys,andweshouldon
[originaltext]Everyoneissupposedtocheerforgoodguys,andweshouldon
[originaltext]Anewstudyhasfoundapositivecorrelationbetweenhowmuch
[originaltext]M:Hi,there!I’vecometoseetheflat.MynameisMarkAdams.W
[originaltext]M:Hi,there!I’vecometoseetheflat.MynameisMarkAdams.W
[originaltext]M:Hi,there!I’vecometoseetheflat.MynameisMarkAdams.W
随机试题
SixStepstoTacklingYourStudentLoans[A]Anypaymentisa
以下关于建筑的设计特征周期的说法中,正确的是()。A.设计特征周期与所在地的
()类公司风险管理能力与其现有业务规模基本匹配。A.B B.C C.D D
井筒施工中的井身工程,其分项工程包括( )。A.井颈工程 B.掘进工程 C
施工企业建立施工项目成本管理责任制、开展成本控制和核算的基础是( )。A.成本预
实际成本法下,已经付款购买但尚未入库的材料,应该通过()账户进行核算。A、材料采
下列各项中,属于工业企业“其他业务收入”的有()。A:出售产品收入B:出售多余
(2020年真题)关于双代号时标网络计划的说法,正确的是( )。A.时间坐标系方
为有效进行施工成本的管理,某项目经理部首先对施工成本进行了预测。根据施工成本管理
下列组织工具中,可以用来对项目的结构进行逐层分解,以反映组成该项目的所有工作任务
最新回复
(
0
)