首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2023-07-06
81
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] The word "evaporate"(Line 7, Para. 3)means_____.
选项
A、steam
B、strengthen
C、flow out
D、harden
答案
A
解析
词汇题。根据上下文来推测词义。根据the ponds are left to evaporate,uncovering piles of dried tailings可判断出由于池塘里的液体蒸发没有了,废料才露了出来。故选项A正确。
转载请注明原文地址:https://tihaiku.com/zcyy/2811852.html
相关试题推荐
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
Whatdodietingandenergypolicyhaveincommon?TheSnackWelleffect.The
Whatdodietingandenergypolicyhaveincommon?TheSnackWelleffect.The
随机试题
Therearetwotypesofpeopleintheworld.Althoughtheyhaveequaldegrees
[originaltext]Withinacontextofrapidtechnologicalchangeandshiftingma
农村集体所有和国家所有由农民集体使用的耕地、林地、草地以及其他用于农业的土地,依
术后呼吸系统并发症错误的是A.90%长骨骨折和关节置换术者,肺血管床发现脂肪颗粒
女性,30岁,患有继发性肺结核。 下列叙述中正确的是A、治疗后病变吸收快,
33岁妇女,孕3产0,3次人流史,近一年月经量增多,伴痛经而就诊,月经周期正常。
寒性哮喘的治法是A.温肺散寒,化痰定喘 B.解表清里,定喘止咳 C.补益肺气
共用题干 第二篇CrystalEarOnedayafriendask
变压器运输到现场后,应检查三维冲击记录仪应具有时标且有合适量程,设备在运输及就位
商业银行最主要的资产业务为()。A.存款 B.贷款 C.投资
最新回复
(
0
)