首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2023-07-06
38
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] The word "evaporate"(Line 7, Para. 3)means_____.
选项
A、steam
B、strengthen
C、flow out
D、harden
答案
A
解析
词汇题。根据上下文来推测词义。根据the ponds are left to evaporate,uncovering piles of dried tailings可判断出由于池塘里的液体蒸发没有了,废料才露了出来。故选项A正确。
转载请注明原文地址:https://tihaiku.com/zcyy/2811852.html
相关试题推荐
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
Whatdodietingandenergypolicyhaveincommon?TheSnackWelleffect.The
Whatdodietingandenergypolicyhaveincommon?TheSnackWelleffect.The
随机试题
Nearlyhalftheworld’spopulationwillexperience【C1】______watershortages
Apple’slaunchoftheiPadisagambleinmorewaysthanone.Tostartwith,
Theappealofadvertisingtobuyingmotivescanhavebothnegativeandposit
下列哪项疾病不会引起血尿酸增高A.肾功能损害 B.痛风 C.肝硬化 D.恶
关于我国建立全科医生制度的总体目标错误的是A.在我国初步建立起充满生机和活力的全
编创打击乐声部伴奏。 要求: (1)自选打击乐器,为谱例《四季调》编配第Ⅱ、
2012年4月,某审计组对丙公司2011年度财务收支情况进行了审计。有关固定资产
保险理赔的程序不包括()。A.确定损失的近因 B.确定责任 C.损失通知
承担药品注册现场检查的机构是A.中国食品药品检定研究院 B.国家药品监督管理局
某河流干流流量为9m3/s,氨氮浓度为1.0mg/L;支流流量为1m3/s,氨氮
最新回复
(
0
)