首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2023-07-06
57
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] It can be inferred from the passage that the most dangerous by-product of uranium mining and milling is______.
选项
A、solid mining wastes
B、the slurry in which the waste is stored
C、the radon gas that is emitted by the waste
D、the uranium that is recovered in the mining operations
答案
C
解析
推断题。选项中的内容在文中均有提及,但是从危害性上讲,选项A、B、D都没有直接说到它们的害处,而文中第三段倒数第二句讲到Uncovered piles of tailings give off radioactive radon gas.Once in the air,thegas finds its way into the water supply and the food chain.故可推断出这种放射性气体才是最有害的。故选项C正确。
转载请注明原文地址:https://tihaiku.com/zcyy/2813186.html
相关试题推荐
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
随机试题
Inthesummerof999,LeifEriksonvoyagedtoNorwayandspentthefollowing
A1999reportbytheUniversityofMichiganshowedthatabout62percentofhigh
下列各项中,属于功能评价方法的有( )。A.价值标准评价方法 B.功能重要性
氨基糖苷类抗菌药的作用机制是A、阻碍细菌细胞壁的合成 B、抑制核酸合成 C、
读我国某山地东坡和西坡年降水量随高度变化示意图,该山地可能是() A.秦岭
能杀灭所有微生物以及细菌芽胞的方法是A、清洁 B、消毒 C、抑菌 D、灭菌
华夏工程设计有限公司前身是华夏化工集团公司的下属设计院,主要为集团公司提供工程
简述现代企业人力资源管理各个历史发展阶段的特点。
建设工程风险识别方法中,属于专家调查法的是( )。A.头脑风暴法 B.风险调查
(2019年真题)水泥混凝土道路基层材料主要根据()选用。A.道路交通等级
最新回复
(
0
)