首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2023-07-06
65
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] The word "evaporate"(Line 6, Para. 3)means______.
选项
A、steam
B、strengthen
C、flow out
D、harden
答案
A
解析
含义题。根据上下文来推测词义。根据the ponds are left to evaporate,uncovering piles of dried tailings.可判断出由于池塘里的液体蒸发没有了,废料才露了出来。故选项A正确。
转载请注明原文地址:https://tihaiku.com/zcyy/2813190.html
相关试题推荐
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
随机试题
Avaliantguerrillasoldierwaskilledyesterday.A、slenderB、haughtyC、braveD、i
Nowcustomhasnotbeencommonlyregardedasasubjectofanygreatimportan
【B1】[br]【B3】[originaltext]PerchedamongthehighlandsofwesternCameroon
竞争性放射免疫分析(RIA)
采用互联网开发法开发客源的劣势是( )。A.成本高 B.客户筛选难度大 C
对于合伙型股权投资基金的利润分配、亏损分担,无法确定出资比例的,应( )。A.
下列关于色彩特性的表述,哪项是错误的?()A.色彩具有色相、彩度及明度三个属
某患者,右上2锥形牙,与邻牙间有1mm间隙,可选择的修复方法中,除了A.树脂贴面
背景资料 某工程大体积混凝土浇筑过程耗时8h,自浇筑开始测温,累计168h的
女性,28岁,右小腿上端内侧发现肿物4年,无明显疼痛,X线显示,右胫骨上端内侧骨
最新回复
(
0
)