All of followings should be done by the
All of followings should be done by the
题库
2022-08-02
55
问题
All of followings should be done by the project manager during project control except ().A.Determine the a change has occurredB.Ensure that a change is agreedC.Make sure all changes are approved by managementD.Manage changes as they occur
选项
答案
B
解析
译文:项目经理不应该在项目控制过程中执行的工作是()。 A)确定变更已经发生 B)确保变更已达成共识 C)确保所有变更都获得管理层批准 D)在变更发生时,对变更进行管理
转载请注明原文地址:https://tihaiku.com/congyezige/2301727.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
Alloffollowingsshouldbedonebythe
Alloffollowingsshouldbedonebythe
Alloffollowingsshouldbedonebythe
随机试题
Thewordhorsepowerwasfirstusedtwohundredyearsago.JamesWatthadmad
[originaltext]W:Hi.IamAliceWilson.Ihaveareservationfortonight.M:Ok
Fromchildhoodtooldage,wealluselanguageasameansofbroadeningou
HintsandTipstoSaveMoneyA)Spendless.Thisisnotoversimplifyingt
轴与⑤~⑥轴之间的次梁数量为(含轴线处,多跨连续梁计为1根):() A
A.-1600 B.-1200 C.-900 D.-700
击出性骨折时最常见的疝入上颌窦的结构是A.骨性眶底 B.眼球 C.眶骨膜
A.静脉麻醉 B.区域阻滞 C.气管内插管吸入麻醉 D.神经阻滞 E.普
称为"十二经脉之海"的静脉是()A.带脉 B.督脉 C.任脉 D.冲
在工程实施过程中,要不断地跟踪、监督索赔事件,就可以不断地发现索赔机会。下列选项
最新回复
(
0
)