All of followings should be done by the
All of followings should be done by the
免费题库
2022-08-02
63
问题
All of followings should be done by the project manager during project control except ().A.Determine the a change has occurredB.Ensure that a change is agreedC.Make sure all changes are approveD.by managementD.Manage changes as they occur
选项
A.Determine the a change has occurred
B.Ensure that a change is agreed
C.Make sure all changes are approveD.by management
D.Manage changes as they occur
答案
B
解析
译文:项目经理不应该在项目控制过程中执行的工作是()。
A)确定变更已经发生
B)确保变更已达成共识
C)确保所有变更都获得管理层批准
D)在变更发生时,对变更进行管理
转载请注明原文地址:https://tihaiku.com/congyezige/2299754.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
Alloffollowingsshouldbedonebythe
Alloffollowingsshouldbedonebythe
Alloffollowingsshouldbedonebythe
随机试题
WhatadifferenceKathleenmadeinmycollegelife!Shewasconfidentwhere
Words______meaning,asweallknow.A、convinceB、conveyC、contributeD、conquer
HowWorkWillChangeWhen
建设单位在编制()时,应当确定建设工程安全作业环境及安全施工措施所需费用。A.
关于土地权属争议的受理,下列选项中说法不正确的是( )。A.国土资源行政主管部
以下属于从事技术、风险监控、合规管理人员可以从事的工作是()?A:营销 B:
护士因认为药物无误,没有进行查对,导致输错药物而致使患者死亡。其行为属于A.渎职
简述制作心理物理量表的感觉比例法的基本步骤。
《中华人民共和国民法典》第7条规定“民事活动应当尊重社会公德,不得损害社会公共利
某汽车生产企业为增值税一般纳税人,2021年8月生产经营情况如下: (1)购进
最新回复
(
0
)