All of followings should be done by the
All of followings should be done by the
最全题库
2022-08-02
74
问题
All of followings should be done by the project manager during project control except( )A.determine that a change has occurredB.ensure that a change is agreedC.make sure all changes are approved by managementD.manage changes as they occur
选项
A.determine that a change has occurred
B.ensure that a change is agreed
C.make sure all changes are approved by management
D.manage changes as they occur
答案
C
解析
以下所有应该由项目经理在项目控制中管理,除了(确保所有的改变都经管理层批准)
A.确定已经发生变更
B.确保变更获得同意
C. 确保所有的改变都经管理层批准
D. 管理变更所发生的
转载请注明原文地址:https://tihaiku.com/congyezige/2302527.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
Alloffollowingsshouldbedonebythe
Alloffollowingsshouldbedonebythe
Alloffollowingsshouldbedonebythe
随机试题
An"epigram"isusuallydescriedasabrightorwittythoughtthatisterselyan
泊珍到偏远小镇的育幼院把生在那里养到1岁的孩子接回来。但泊珍看他第一眼,仿似一声雷劈头而来。令她晕头胀脑,这1岁的孩子脸型长得如此熟悉,她心里的第一道声
Accordingtothepassage,employmentlettersincludethefollowingformsexcept
AsaprofessoratalargeAmericanuniversity,Ioftenhearstudentssaying:
D是一家小型家具制造商。已知该公司20×5年营业收入2000万元,营业净利润率5
对于,可有效消除或部分消除黄土湿陷性的方法是( )。A、强夯法 B、预压法
210个边长为1厘米的小正方体组成的长方体,其表面积最小为多少?()A.
梅兰芳之于京剧正如()之于() A.周立波舞蹈B关汉卿昆曲
A企业2020年6月1日“材料成本差异”科目的借方余额为400
这种形式换热器的结构简单,重量轻,适用于高温和高压场合。主要缺点是管内清洗比较困
最新回复
(
0
)