L&A Construction shipped the construction materials to Systech Corporation on Ma

游客2025-06-14  3

问题 L&A Construction shipped the construction materials to Systech Corporation on May 20, fulfilling its contractual______three months early.

选项 A、obligation
B、surplus
C、indication
D、forecast

答案 A

解析 词汇:名词1.本题考查名词的选择。2.空格处应填入一个被动形容词contractual修饰的名词,根据“提前三个月履行合同”的语义可知应选择(A)选项obligation。
转载请注明原文地址:https://tihaiku.com/zcyy/4117541.html
最新回复(0)