首页
登录
职称英语
- Your team won a big construction contract for your company last month. Your Ma
- Your team won a big construction contract for your company last month. Your Ma
游客
2025-05-31
14
管理
问题
- Your team won a big construction contract for your company last month. Your Managing Director has asked you to prepare a report on your achievement.
- Write a report to the Managing Director:
- saying what you have prepared for the bidding
- outlining your plans for future work
- telling what kind of help you may need from the company.
选项
答案
Report on our achievement in the construction bidding
The report sets out to describe our success in winning the big construction contract last month as well as plans for future work of the construction.
In the preparation for bidding for the construction, we made a large amount of investigations, including the construction site, the distribution of various wires in the area as well as the cost and profits of the whole project. Based on all the findings and analysis of the investigation, we completed our tender, engineering drawing and estimated budget. It contained all the excellent features of our competitors and excelled all of them in the aspect of daylight and heat design, which enabled us to win the contract.
As for future work, several tasks as follows should be carried out. In the first place, the construction site must be cleaned and leveled off in two weeks. Meantime, designs of the project should be reexamined by another group of engineers in case there should be any inappropriate mistakes. Synchronised with that, relevant equipments and materials for construction must be purchased, inspected and safely kept in the construction site for the course of construction. The preparation and construction office is responsible for these two parts. Above all, temporary water and electricity must be switched in immediately. Construction work will get started once preparation work gets finished.
Since it’s a very big project and its success is essential to our company, adequate provision of personnel and funds must be assured. Specific demands are listed in the documents appended.
解析
题目要求写一份报告。根据题目要求可知,这是一份写给总经理的关于赢得建设工程投标的报告。要求首先说明为竞标所做的准备,接下来说明将来的工作计划,最后说明需要公司提供的帮助。写作时应注意条理清晰,层次分明,注意前后文衔接及语意逻辑关系,同时应注意避免语法、拼写等错误。
转载请注明原文地址:https://tihaiku.com/zcyy/4098422.html
相关试题推荐
Welcome欢迎Welcometoourcompany.
Marketing:howtoensurethatacompany’smarketingliteratureisattractiveto
Motivation:theimportanceofmotivatingstaffatalllevelsofacompanySugges
StaffRelations:theimportanceofacompanyprovidingarangeoffacilitiesfor
QualityControl:theimportancetoacompanyofmonitoringthequalityofitsgo
Dealwithanythingnotcovered提议讨论尚未商谈的事项Nowwecangetthecontractfinalized.
TaskSheet:StaffPromotion:TheHRManagerofyourcompanypropose
FortwocandidatesYourcompanyaresuedforillegalarbitragewithastockbroke
FortwocandidatesYourcompanyisplanningtoestablishafactorywithanother
Task10RelocatingtoNewPremisesThecompanyyouworkforisgrowingrapidlya
随机试题
A.fightingB.subjectsC.certainlyD.questionE.resultinF.further
Inthissection,youaregoingtoreadapassagewithtenstatementsattachedto
WHO提出“2000年人人享有卫生保健”全球卫生战略目标是在()A.1976年
水平型食物嵌塞的原因() A.邻牙触点丧失 B.牙龈萎缩 C.
写字楼的特性不包括( )。A、与宏观经济正相关 B、客户非个体属性 C
浸润性突眼才具有的表现是A.瞬目减少 B.上眼睑挛缩 C.睑裂增宽 D.眼
资本充足率压力测试应覆盖全行范围内的实质性风险。()
物权的优先效力表现在()。A.房屋出售时,租赁人在同等条件下享有优先购买权
可加快矿业工程施工进度的组织措施是()。A.合理调配劳动力及施工机械设备
通过加强施工定额管理和施工任务单管理,控制活劳动和物化劳动的消耗,这属于施工成本
最新回复
(
0
)