首页
登录
职称英语
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretch
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretch
游客
2025-05-11
19
管理
问题
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northern most state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely operating.
The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels of crude oil can be pumped through it daily.
Resting on H-shaped steel racks called "bents, "long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline’s up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permanently frozen ground. A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil.
One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortages, equipment breakdowns, labor disagreements, treacherous terrain, a certain amount of mismanagements and even theft the Alaska pipeline has been completed and is operating. [br] Which of the following determined what percentage of the construction costs each member of the consortium would pay?
选项
A、How much oil field land each company owned.
B、How long each company had owned land in the oil fields.
C、How many people worked for each company.
D、How many oil wells were located on the company’s land.
答案
A
解析
根据第4段的“Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction,fund according to the size of its holdings”可知,A项为正确答案。
转载请注明原文地址:https://tihaiku.com/zcyy/4071047.html
相关试题推荐
TheAlaskapipelinestartsatthefrozenedgeoftheArcticOcean.Itstretch
TheAlaskapipelinestartsatthefrozenedgeoftheArcticOcean.Itstretch
TheAlaskapipelinestartsatthefrozenedgeoftheArcticOcean.Itstretch
He(stood)ontiptoe,(stretching)asfarashecould,(however),still,he(cou
Allthemusicinstrumentsintheorchestrawillbe______beforeitstarts.A、civ
Everhearofthelemming?Lemmingsarearcticrat-likeanimalswithveryodd
Everhearofthelemming?Lemmingsarearcticrat-likeanimalswithveryodd
Everhearofthelemming?Lemmingsarearcticrat-likeanimalswithveryodd
InpartsoftheArctic,thelandgradesintothelandfasticeso______thatyou
Allthemusicinstrumentsintheorchestrawillbe______beforeitstarts.A、civ
随机试题
WheredidGailspendthenightsinthecountry?[br][originaltext]W:Morning.
HenryIIIdidn’tknowmuchaboutbiology.Hewentthroughsixwivesbackin
LED大屏幕、LED彩幕、大功率投影机、视频编辑机、专业摄像机、放像机等是视频系
建设工程施工投标报价程序中,确定基础标价的紧后工作是( )。A.标书编制 B
A.胃癌破裂出血 B.肝内胆道出血 C.出血性胃炎 D.食管胃底静脉破裂出
根据《国家文化和旅游部关于旅游不文明行为记录管理暂行办法》的规定,旅游不文明行为
以下关于社会思潮对高校教师价值观正面影响的说法不正确的是A.开拓教师的眼界和知
下列选项中,关于教师职业发展的“生存关注”阶段描述正确的是()。 A.这一阶段
某市混凝土公司新建临时搅拌站,在试运行期间通过暗管将污水直接排放到周边,严重破坏
某建设工程项目在施工过程中出现混凝土强度不足的质量问题,采用逐层深入排查的方法,
最新回复
(
0
)