首页
登录
职称英语
Engineering for sustainable developmentThe Greenhouse Project (Himalayan mounta
Engineering for sustainable developmentThe Greenhouse Project (Himalayan mounta
游客
2025-02-10
19
管理
问题
Engineering for sustainable development
The Greenhouse Project (Himalayan mountain region)
Problem
Short growing season because of high altitude and low【L31】________
Fresh vegetables imported by lorry or by【L32】________ , so are expensive
Need to use sunlight to prevent local plants from【L33】________
Previous programmes to provide greenhouses were【L34】________
New greenhouse
Meets criteria for sustainability
Simple and【L35】________ to build
Made mainly from local materials (mud or stone for the walls, wood and【L36】________ for the roof)
Building and maintenance done by local craftsmen
Relies solely on【L37】________energy
Only families who have a suitable【L38】________can own one
Design
Long side faces south
Strong polythene cover
Inner【L39】________ are painted black or white
Social benefits
Owners’ status is improved
Rural【L40】________ have greater opportunities
More children are educated [br] 【L39】
Good afternoon. This is the first of a series of lectures I’ll be giving about engineering for sustainable development. I’ll be presenting examples of engineering projects from a variety of contexts, and today I’m going to talk about a project to design a new kind of greenhouse for use in the Himalayan mountain regions.
First of all, I’ll tell you about the problem which was the context for this project. In the Himalayan mountains, fresh vegetables and other crops can only be grown outside for about ninety days, during the summer, because the altitude of the region is around 3500 metres, and
because the rainfall is so low.
In winter, temperatures fall below minus 25 degrees Celsius, so fresh vegetables have to be imported. They arrive by truck in summer or
by air in winter,
which makes them expensive. Local people rely on dried leafy vegetables and stored root crops during the winter, and rarely eat fresh vegetables.
But despite the sub-zero temperatures, the skies over the region are cloudless, and there are over three hundred sunny days per year. So an engineering solution was needed, to exploit the sun’s energy and
protect locally produced plants from freezing during winter.
And in fact,
there has been programmes in the past to provide greenhouses, but these were unsuccessful.
The greenhouses weren’t adapted for local conditions, so they tended to fall into disuse.
So, a few years ago, a project was initiated to design a better greenhouse, one which would meet the criteria for sustainability.
So, what are the criteria for sustainability? Well, first of all, the new greenhouse is designed to be relatively simple,
so construction is cheap.
Locally available materials are used wherever possible. The walls are generally constructed of mud bricks, made locally, although in areas of high snow-fall more resilient walls of stone are needed. Rammed earth is also used. The main roof is generally made from locally available poplar wood,
with water-resistant local grass for the covering.
In addition, the construction and maintenance of the greenhouse are done by local craftsmen. So local stone masons are employed to build the greenhouse walls, and specialised training is provided for them wherever necessary.
Then...
the greenhouse is designed to run on solar power alone,
there’s no supplementary heating. And lastly, families are selected to own one of the new greenhouses with great care.
They have to have a site which is suitable for constructing it on.
They also have to be keen to make a success of using it, and also to share the produce with the wider community through sale or barter. Potential owners are taken to see existing greenhouses before they make a final decision about having one.
So, those are the features which make the project sustainable. And now I’ll briefly describe the design of the greenhouse. The greenhouses are orientated very carefully along an East-West axis so that there’s a long south-facing side. The transparent cover on the south-facing side is made from a heavy-duty polythene, which should last for at least five years.
On the inside of the greenhouse, the walls are painted
— the rear and west-facing walls are black, to improve heat absorption, but the east-facing wall is white to reflect the morning sunlight onto the crops inside. Finally, there’s a door in the wall at one end, and vents are incorporated into the roof, the door and the wall at the other end, to enable control of humidity and prevent overheating.
I’ll turn now to the benefits which have resulted from the introduction of these new greenhouses. These benefits are of various kinds, but for now I’ll just mention the social benefits.
First of all, people who own a greenhouse gain social standing in their communities, because they provide vegetables for the wider community, for regular consumption as well as for festivals, and they also earn income. Secondly,
because in rural areas it is women who usually grow the food, the greenhouses have increased their opportunities.
They bring the benefits of improved nutrition, and increased family income, from the sale of surplus produce. And thirdly, as a result of their improved financial position, some families can now afford to educate their children for the first time.
选项
答案
walls
解析
空格前为形容词Inner,推测应填入一个名词。录音原文中以两个并列句的形式(the rear and west-facing walls are black...but the east-facing wall is white…)解释了题目中的并列形容词black or white。are painted是原词复现。故空格处填入walls。
转载请注明原文地址:https://tihaiku.com/zcyy/3950946.html
相关试题推荐
EngineeringforsustainabledevelopmentTheGreenhouseProject(Himalayanmounta
EngineeringforsustainabledevelopmentTheGreenhouseProject(Himalayanmounta
EngineeringforsustainabledevelopmentTheGreenhouseProject(Himalayanmounta
EngineeringforsustainabledevelopmentTheGreenhouseProject(Himalayanmounta
EngineeringforsustainabledevelopmentTheGreenhouseProject(Himalayanmounta
JennyandPaulagreetheyneeda___________________fortheproject.timetable
JennyandPaulmustcompletetheirprojectby___________________.[originaltex
Whatproblemsdothespeakersidentifyforthisproject?ChooseSEVENanswersfr
Whatproblemsdothespeakersidentifyforthisproject?ChooseSEVENanswersfr
Whatproblemsdothespeakersidentifyforthisproject?ChooseSEVENanswersfr
随机试题
Onecalledherbossa"bitchfromhell"whileanotheradmitted"lyingthroug
宗地图是以( )为单位编绘的地籍图。A.地图标准分幅 B.宗地 C.村
患者,男性,60岁。持续性上腹疼痛伴腰背部放射痛8小时,恶心、呕吐,吐后腹痛无减
男性,20岁。平素健康,淋雨后突发寒战、高热、头痛,第2天出现右侧胸痛、咳嗽、咳
公积金管理中心审批通过借款人的申请后,向受委托主办银行出具《委托贷款通知书》,明
影响股价变化的其他因素包括()。 ①心理因素 ②人为操纵因素 ③政策及制
小丽,13岁,初一学生,父母双亡,又无其他亲属抚养,被民政部门认定为城市“三无”
以下属于企业要素的有()A.人力、物力、财力 B.信息、知识、技术
《证券法》规定,我国证券公司的组织形式为有限责任公司或者股份有限公司,不得采取
需在两餐间服用的双膦酸盐类药物为A.阿仑膦酸钠 B.唑来膦酸钠 C.利塞膦酸
最新回复
(
0
)