首页
登录
职称英语
[originaltext]I: Good morning, ladies and gentlemen. Today we are greatly honor
[originaltext]I: Good morning, ladies and gentlemen. Today we are greatly honor
游客
2024-11-04
20
管理
问题
I: Good morning, ladies and gentlemen. Today we are greatly honored to have Mr. Alan Gibbons, an inspector from the Australian Industrial Bureau to introduce us an important stage in the production process - quality control. Well, Alan.
A: Good morning everyone.
I: Alan, it is believed that an effective quality control system amounts to an inspection of the finished product. Is that right?
A: It is true in certain aspects. However, it has got problems. The main drawback with a finished product inspection is that it is an "after the act" operation. You know, no amount of inspection can make bad work good at this stage.
I: Then when is the ideal time for quality control?
A: Most large scale manufacturers consider quality control to be an ongoing process. The advantages of this are considerable. It cuts wastage, it saves time, as no hours are lost on work done on already defective items, and perhaps most importantly, it is easier to detect a fault, when the product is still at the component stage.
I: That’s reasonable. So what should quality control begin with?
A: Well, usually with raw materials. If the materials are of sub-standard materials there is no point in processing them. More to the point, sub-standard materials can be returned to the company at no cost to the manufacturer.
I: Mm, this is obvious.
A: Although these benefits seem obvious, you might be surprised to know that only 87% of large firms and 62% of small firms have a standard raw material inspection procedure. For the same reasons, it is a good idea to test components brought in from another company.
I: I see. After that, what should be inspected?
A: In many manufacturing processes, it is useful to carry out some form of quality control on products while they are still being manufactured. It is often easier to check individual components before assembly takes place. Equally, it may be valuable to test components by their function. I suppose the bottom line is that every product and every company has its own requirements and the quality control programme should be arranged accordingly.
I: So if each component functions well, the entire product comes out right.
A: Exactly.
I: Then what are we testing for? I mean do we test the same things out of different products or do we test differently?
A: Of course this depends on the product, too. An expensive car has different requirements from a cheap plastic toy. However, in both cases the most vital testing is for safety.
1. What is the main disadvantage of finished product inspection ?
2. Which one is NOT the advantage of keeping quality control as an ongoing process ?
3. What should quality control begin with?
4. What are the percentages of large firms and small firms in terms of standard raw material inspection procedure?
5. What is the most vital aspect in testing?
选项
A、Cost.
B、Appearance.
C、Safety.
D、Function.
答案
C
解析
信息题。录音中提到:An expensive car has different requirements from a cheap plastic toy.However in both cases the most vital testing is for safety.制造一辆昂贵的车和制作一个便宜的塑料玩具,它们的要求不同,但是两者最重要的检测都是安全性,所以答案是选项C。
转载请注明原文地址:https://tihaiku.com/zcyy/3830471.html
相关试题推荐
[originaltext]W:Letmeturnitontothemanwhomayendupthewinner,Mr.As
[originaltext]W:Letmeturnitontothemanwhomayendupthewinner,Mr.As
[originaltext]W:Goodevening,listeners.ThisisBBC.Today,weareverydelig
[originaltext]W:Goodevening,listeners.ThisisBBC.Today,weareverydelig
[originaltext]J:Becausein1987theDepartmentofEducationandScienceestabl
[originaltext]J:Becausein1987theDepartmentofEducationandScienceestabl
[originaltext]I:Goodmorning,everyone.TodayI’dliketointroduceProfessor
[originaltext]I:Goodmorning,everyone.TodayI’dliketointroduceProfessor
[originaltext]I:Goodmorning,everyone.TodayI’dliketointroduceProfessor
[originaltext]I:Goodmorning,everyone.TodayI’dliketointroduceProfessor
随机试题
A、neverB、oftenC、everD、onceC本句意为:我感觉我以前知道的事情也都从大脑里抹掉了。故正确的答案为C。
Wewereallsurprised__________________(当他宣布马上要辞职时).whenhemadeitcleartha
对图中车辆从路中心黄色虚实线的虚线一侧暂时越过超车,这是允许的。
下面哪些属于保障电子文件真实性的措施()。A.建立对电子文件操作者可靠的身份识
对于流动资产贷款,商业银行应根据( ),合理约定贷款资金支付方式及贷款人受托支
隔离开关位置信号不正确时的处理原则,正确的是()。(A)该隔离开关禁止操作,立即
设备及建筑物的防雷保护方式属于()审查内容(A)系统部分(B)一次部分
求助者一般资料:男性,20岁,工厂工人。 求助者主诉:求助者半年以前与同一工厂
工程建设项目招标投标活动应遵循()原则。A.多方协商 B.独立 C.诚实信
甲公司是一家生产家用电器的上市公司。2×20年7月1日,甲公司与一家大型连
最新回复
(
0
)