首页
登录
职称英语
What caused all the trouble? [originaltext] A storm that dropped a foot or m
What caused all the trouble? [originaltext] A storm that dropped a foot or m
游客
2024-10-03
1
管理
问题
What caused all the trouble?
A storm that dropped a foot or more of snow bogged down highways and closed schools on Tuesday from the Plains to New England, and some travelers had to spend the night on a church floor. "I like snow. But I’d like to see this go. I thought the winter was over," said Bob Neeley of Olmsted, Illinois, which got about 8 inches of snow, the southern Illinois town’s most since 1979. Many drivers ended up in ditched or in fender-bender accidents. Police in western New York State blamed one traffic death on the weather. On Monday, the storm was blamed for seven traffic deaths--four in Missouri, two in Oklahoma, and one in Kentucky.
选项
A、A storm.
B、A car accident.
C、A driver driving too fast.
D、A flood.
答案
A
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3784795.html
相关试题推荐
EveryAprilIamtroubledbythesameconcern—thatspringmightnotoccurth
EveryAprilIamtroubledbythesameconcern—thatspringmightnotoccurth
EveryAprilIamtroubledbythesameconcern—thatspringmightnotoccurth
Whendidthefirebreakout?[br][originaltext]AfireatSingapore’sHote
Americansensureproperrespectforthenationalflagby[br][originaltext]
Americansensureproperrespectforthenationalflagby[br][originaltext]
Americansensureproperrespectforthenationalflagby[originaltext][14]L
WhereareJoan’sfamilyaregoingtospendsummer?[br][originaltext]W:Charle
WhereareJoan’sfamilyaregoingtospendsummer?[br][originaltext]W:Charle
WhereareJoan’sfamilyaregoingtospendsummer?[originaltext]W:Charles,Iw
随机试题
Suchhistories_____________(也许可比作)astagecoach,whichperformsconstantlythe
机电设备运抵工地后,参与开箱检查和验收的单位有( )。A.监理单位 B.安装
常见的公共费用分摊方法有()。A.人员数量 B.工时 C.销售收入 D.机
肌张力评定描述不正确的是A.评定中枢神经系统损伤 B.评定周围神经系统损伤
某企业信息化系统建设初期,无法全面准确获取需求,此时可以基于对已有需求的初步理解
无论采用击实试验方法,还是采用振动试验方法,试验的目的为提供最佳含水率和最大干密
根据上述资料,下列说法正确的是:A.2019年北京客运总量超过石家庄的1
()的项目管理是工程项目管理的核心。A.工程承包单位 B.业主方 C.
(2021年第2批真题)根据《质量管理体系基础和术语》,循证决策原则要求施工企业
某双代号网络计划中,假设计划工期等于计算工期,且工作M的开始节点和完成节点均
最新回复
(
0
)