首页
登录
职称英语
A. recent B. capacity C. milestone D. resources E. successF. checked G. shoestr
A. recent B. capacity C. milestone D. resources E. successF. checked G. shoestr
游客
2024-09-07
64
管理
问题
A. recent B. capacity C. milestone D. resources E. success
F. checked G. shoestring H. objective I. current J. record
K. monitored______L. deposits______M, scarce______ N. ambitious O. resolution
Just in time for India’s Independence Day, the country’s first interplanetary mission has sent back beautiful images of the Red Planet’s surface.
The Indian Space Research Organisation’s Mars Orbiter Mission was launched in November 2013 on a 【C1】______ budget compared with other space missions. All up, it’s estimated that it cost about $74 million, compared with NASA’s $671 million Maven Mars orbiter mission, which launched around the same time.
India’s mission, also known as Mangalyaan, has been something of a【C2】______ story for the country’s space agency. It is India’s first attempt at an interplanetary mission — and an【C3】______ one. Mars serves as the next major【C4】______ in space exploration, and India is the first country to succeed in reaching the planet’s orbit in its first attempt. More than half of all attempts to reach Mars fail, and India not only got it right on its first try, but it did so at【C5】______ low cost.
Mangalyaan reached Mars orbit in September 2014. Since then it has【C6】______ the planet, studying its atmosphere and particle environment. It’s also been surveying the surface of Mars, sending back images taken with its Thermal Infrared Spectrometer and tricolour Mars Colour Camera.The most【C7】______ one, snapped on July 19, shows a portion of the Ophir Chasma, a deep canyon about 317km long and 62km wide.
Ophir Chasma is part of the largest canyon system in the solar system known as Valles Marineris. The walls of the chasma contain many layers and the floors contain large【C8】______ of layered materials. This image was taken at an altitude of 1,857 km with a【C9】______ of 96 megapixels.
The project’s primary【C10】______, while also aimed at collecting data from Mars, is to serve as a demonstration of India’s ability to develop and implement interplanetary space technology. [br] 【C2】
选项
答案
E
解析
(success)选择依据有两个:1.上下文,即第一段和第二段对于发射成功的描述;2.名词词组(success story)的常用搭配。success story表示“成功的范例”,如:The company has been a major success story.
转载请注明原文地址:https://tihaiku.com/zcyy/3747417.html
相关试题推荐
(1)TodayisamajormilestoneforMicrosoftasweholdourfirstProfessiona
(1)TodayisamajormilestoneforMicrosoftasweholdourfirstProfessiona
A.recentB.capacityC.milestoneD.resourcesE.successF.checkedG.shoestr
A.recentB.capacityC.milestoneD.resourcesE.successF.checkedG.shoestr
______inarecentsciencecompetition,thethreestudentswereawardedscholarsh
(1)Yetthisbuoyancyischeckedbyequallypotentanxieties.Germany’sbest-
Recentlymanyschoolshavefacedwhatcouldbecalledthecrisisofcomprehensio
(1)Asrecentlyas50yearsago,economistsregardedthevitalityoftheecon
(1)Asrecentlyas50yearsago,economistsregardedthevitalityoftheecon
(1)Asrecentlyas50yearsago,economistsregardedthevitalityoftheecon
随机试题
Whatdoesthegirlwant?[originaltext]M:Whichwouldyouliketodrink,teaor
TipsforThoseWhoTravelAloneA)Whenitcomestotraveling,sometimes
NewresearchfromtheUnitedStatessuggeststhatthemillennia-oldtherapy
下列属于劳动者的基本权利的有( )。A、职业安全权 B、休息权 C、结社罢工
下列各项成本费用中,属于酌量性固定成本的是( )。 A.广告费 B.运输
根据九部委设备采购合同的规定,设备付款的类型包括( )。A.预付款 B.进度款
三相导线的几何均距越大,则导线的电抗()。A.越大 B.越小 C.不变
《民用建筑节能条例》规定,大型公共建筑的所有权人应当对建筑的能源利用效率进行测评
在价值工程活动中,常用于方案综合评价的定量方法包括()。A.优缺点列举法
(2014年真题)当初步设计深度较深、有详细的设备清单时,最能精确地编制设备安装
最新回复
(
0
)