首页
登录
职称英语
A. recent B. capacity C. milestone D. resources E. successF. checked G. shoestr
A. recent B. capacity C. milestone D. resources E. successF. checked G. shoestr
游客
2024-09-07
43
管理
问题
A. recent B. capacity C. milestone D. resources E. success
F. checked G. shoestring H. objective I. current J. record
K. monitored______L. deposits______M, scarce______ N. ambitious O. resolution
Just in time for India’s Independence Day, the country’s first interplanetary mission has sent back beautiful images of the Red Planet’s surface.
The Indian Space Research Organisation’s Mars Orbiter Mission was launched in November 2013 on a 【C1】______ budget compared with other space missions. All up, it’s estimated that it cost about $74 million, compared with NASA’s $671 million Maven Mars orbiter mission, which launched around the same time.
India’s mission, also known as Mangalyaan, has been something of a【C2】______ story for the country’s space agency. It is India’s first attempt at an interplanetary mission — and an【C3】______ one. Mars serves as the next major【C4】______ in space exploration, and India is the first country to succeed in reaching the planet’s orbit in its first attempt. More than half of all attempts to reach Mars fail, and India not only got it right on its first try, but it did so at【C5】______ low cost.
Mangalyaan reached Mars orbit in September 2014. Since then it has【C6】______ the planet, studying its atmosphere and particle environment. It’s also been surveying the surface of Mars, sending back images taken with its Thermal Infrared Spectrometer and tricolour Mars Colour Camera.The most【C7】______ one, snapped on July 19, shows a portion of the Ophir Chasma, a deep canyon about 317km long and 62km wide.
Ophir Chasma is part of the largest canyon system in the solar system known as Valles Marineris. The walls of the chasma contain many layers and the floors contain large【C8】______ of layered materials. This image was taken at an altitude of 1,857 km with a【C9】______ of 96 megapixels.
The project’s primary【C10】______, while also aimed at collecting data from Mars, is to serve as a demonstration of India’s ability to develop and implement interplanetary space technology. [br] 【C1】
选项
答案
G
解析
(shoestring)选择依据有两个:1.上下文,即$74 million的成本与$671 million的成本的巨大差异;2.与名词(budget)的常用搭配,shoestring budget表示“小成本,小预算”,如:The film was made on a shoestring budget.
转载请注明原文地址:https://tihaiku.com/zcyy/3747416.html
相关试题推荐
(1)TodayisamajormilestoneforMicrosoftasweholdourfirstProfessiona
A.recentB.capacityC.milestoneD.resourcesE.successF.checkedG.shoestr
A.recentB.capacityC.milestoneD.resourcesE.successF.checkedG.shoestr
A.recentB.capacityC.milestoneD.resourcesE.successF.checkedG.shoestr
A.recentB.capacityC.milestoneD.resourcesE.successF.checkedG.shoestr
(1)Yetthisbuoyancyischeckedbyequallypotentanxieties.Germany’sbest-
(1)Yetthisbuoyancyischeckedbyequallypotentanxieties.Germany’sbest-
(1)Yetthisbuoyancyischeckedbyequallypotentanxieties.Germany’sbest-
(1)Asrecentlyas50yearsago,economistsregardedthevitalityoftheecon
(1)Asrecentlyas50yearsago,economistsregardedthevitalityoftheecon
随机试题
WhodidNOTattendtheconferenceoneducationalgames?[br][originaltext]
[originaltext]Nowadaystherearemoreandmorewaysofgoingonholiday.Mor
探测总线短路、断路、过流、过载都会造成电气火灾监控系统线路故障。
求出一个齐次线性方程组,使它的基础解系由向量组成
按《岩土工程勘察规范》(GB50021—2001),砂土(粉砂)和粉土的分类
1992年,以家电研发、生产和销售为主业的信达公司确立了“技术立企”的发展战略。
《设计采购施工(EPC)/交钥匙合同条件》中,合同文件的组成及其优先次序说法正确
()是指直接位于煤层之上极易脱落的页岩,随落煤而掉,具有较大的支护难度,且厚
港口工程质量检验评定中,把工程划分为( )。A.单位工程 B.单项工程 C
关于民事诉讼的法院管辖,下列说法正确的是()。A.当事人对管辖权有异议的,应当
最新回复
(
0
)