首页
登录
职称英语
SummaryListen to the passage. For questions 26—30, complete the notes using no
SummaryListen to the passage. For questions 26—30, complete the notes using no
游客
2024-08-14
49
管理
问题
Summary
Listen to the passage. For questions 26—30, complete the notes using no more than three words for each blank.
The best-seller wooden toy among our products is【D6】______, which is designed for 【D7】______. Our output per month is 4,000 items, and the average【D8】______time per box is 5 minutes. We have 1000 boxes in storage, and the next dispatch will come on November third. Currently , we have 20 drivers and 40 staff working on the【D9】______. All staff do【D10】______ work. [br] 【D10】
Summary
Listen to the passage. For questions 26—30, complete the notes using no more than three words for each blank.
Well, the next product I want to move onto is children’s toys. In this part of building, we manufacture several different wooden toys. But the greatest demand is for our train sets. These are made up of ten pieces and each piece is a different color. It’s a toy for the under-fives and it sells well. We manufacture 1,000 of these every week. That’s a total production of 4,000 a month. Over here, we put all the toys into boxes. Because this is a product for young children, everything has to be very carefully checked beforehand. So the average time it takes for packaging is 5 minutes per box.
We supply a lot of large department stores throughout the country. Orders are not constant, but go up and down depending on what time of the year it is. So we try to keep about 1,000 boxes in storage at any one time. That’s the number that we have at the moment anyway. As I said, we deliver our children’s toys to stores around the country. Outside, we’re just loading up the lorries which are going to set off tomorrow. That’s November third. Then there won’t be another dispatch until 10th, November.
We have 20 drivers working in this area at the moment and we have 40 staff working on the production lines. As we need to work at night as well as during the day, everyone does some kind of shift work, though the hours vary according to area of production that they’re working.
选项
答案
shift
解析
(根据录音中的“everyone does some kind of shift work”可知,所有员工实行换班制度。故填shift,表示“换班”。)
转载请注明原文地址:https://tihaiku.com/zcyy/3719492.html
相关试题推荐
Everyoneknewthat______theprojectwouldbecompletedandwe’dallhavetoretu
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
随机试题
Allthestudentsofthisuniversityhavefree______totheInternetviaabroad
Themoretimescientistsspenddesigningcomputers,themoretheymarvelat
在基础平面图中,只画出基础墙、柱及基础底面的轮廓线,其中基础底面的轮廓线应画成(
下列关于资产负债表的表述,其正确的有()。A.它反映一定时期内财务成果的报表
患者男,13岁。发热两周后,突然出现肢体软弱无力,并很快出现肌肉萎缩,皮肤干燥,
侵蚀性葡萄胎和绒毛膜癌均可发生于A:自然流产后 B:人工流产后 C:足月分娩
掌握知识是智力发展的基础,因此,掌握的知识越多,智力发展水平就越高,能力就越强
已经计提跌价准备的存货,只有价值上升导致可变现净值超过成本,则应在原已计提的存货
某工程,实施过程中发生如下事件: 事件2:项目监理机构编制监理规划时初步确定的
某工程现场临时用水总量Q=14.8L/s,管网中水流速度v=1.88m/s,该工
最新回复
(
0
)