首页
登录
职称英语
SummaryListen to the passage. For questions 26—30, complete the notes using no
SummaryListen to the passage. For questions 26—30, complete the notes using no
游客
2024-08-14
20
管理
问题
Summary
Listen to the passage. For questions 26—30, complete the notes using no more than three words for each blank.
The best-seller wooden toy among our products is【D6】______, which is designed for 【D7】______. Our output per month is 4,000 items, and the average【D8】______time per box is 5 minutes. We have 1000 boxes in storage, and the next dispatch will come on November third. Currently , we have 20 drivers and 40 staff working on the【D9】______. All staff do【D10】______ work. [br] 【D9】
Summary
Listen to the passage. For questions 26—30, complete the notes using no more than three words for each blank.
Well, the next product I want to move onto is children’s toys. In this part of building, we manufacture several different wooden toys. But the greatest demand is for our train sets. These are made up of ten pieces and each piece is a different color. It’s a toy for the under-fives and it sells well. We manufacture 1,000 of these every week. That’s a total production of 4,000 a month. Over here, we put all the toys into boxes. Because this is a product for young children, everything has to be very carefully checked beforehand. So the average time it takes for packaging is 5 minutes per box.
We supply a lot of large department stores throughout the country. Orders are not constant, but go up and down depending on what time of the year it is. So we try to keep about 1,000 boxes in storage at any one time. That’s the number that we have at the moment anyway. As I said, we deliver our children’s toys to stores around the country. Outside, we’re just loading up the lorries which are going to set off tomorrow. That’s November third. Then there won’t be another dispatch until 10th, November.
We have 20 drivers working in this area at the moment and we have 40 staff working on the production lines. As we need to work at night as well as during the day, everyone does some kind of shift work, though the hours vary according to area of production that they’re working.
选项
答案
production lines
解析
(根据录音中的“we have 40 staff working on the production lines”可知,生产线上的员工一共有40名。故填production lines,表示“生产线”。)
转载请注明原文地址:https://tihaiku.com/zcyy/3719491.html
相关试题推荐
Everyoneknewthat______theprojectwouldbecompletedandwe’dallhavetoretu
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
随机试题
【M1】Prosperousalumnihelpedmake2006arecordedfund-raisingyearforcoll
【B1】[br]【B9】将genetic改成genetically。geneticallyprogrammed表示“在基因方面已设置了程序的”。在语法上一
[originaltext](12)Youngwomenarelosingfaithintheuniversitysystemwi
Inan【B1】______tobringtogetheramateurandprofessionalracingactivities,
女性,60岁,绝经10年,有慢性盆腔炎及不孕病史,阵发性腹痛,伴阴道排血水。本例
申脉穴位于A.腓骨小头前下方凹陷中 B.外踝尖与跟腱之间的凹陷处 C.内踝尖
某省重点工程项目计划于2008年12月28日开工,由于工程复杂,技术难度高,一般
A.1:5 B.1:8 C.1:2 D.1:4 E.1:10双嘧啶片中T
《中华人民共和国环境保护法》规定,()对一个行政区域的环境质量负责。 A当
对在石油化工企业设置的火炬系统与其他装置之间的防火间距有严格的规定。距火炬筒(
最新回复
(
0
)