首页
登录
职称英语
The best-seller wooden toy among our products is【D1】________,which is desi
The best-seller wooden toy among our products is【D1】________,which is desi
游客
2024-08-13
7
管理
问题
The best-seller wooden toy among our products is【D1】________,which is designed for【D2】________.Our output per month is 4,000 items, and the average【D3】________ time per box is 5 minutes.We have 1,000 boxes in storage, and the next dispatch will come on November third.Currently, we have 20 drivers and 40 staff working on the【D4】________.All staff do【D5】________ work. [br] 【D3】
Well, the next product 1 want to move onto is children’ s toys.In this part of building, we manufacture several different wooden toys.But the greatest demand is for our train sets.These are made up of ten pieces and each piece is a different color.It’ s a toy for the under-fives and it sells well.We manufacture 1,000 of these every week.That’s a total production of 4, 000 a month.Over here, we put all the toys into boxes.Because this is a product for young children, everything has to be very carefully checked beforehand.So the average time it takes for packaging is 5 minutes per box.
We supply a lot of large department stores throughout the country.Orders are not constant, but go up and down depending on what time of the year it is.So we try to keep about 1,000 boxes in storage at any one time.That’ s the number that we have at the moment anyway.As I said, we deliver our children’ s toys to stores around the country.Outside, we’ re just loading up the lorries which are going to set off tomorrow.That’ s November third.Then there won’ t be another dispatch until 10th, November.
We have 20 drivers working in this area at the moment and we have 40 staff working on the production lines.As we need to work at night as well as during the day, everyone does some kind of shift work, though the hours vary according to area of production that they’ re working.
选项
答案
packaging
解析
根据录音中的“So the average time it takes for packaging is 5 minutes per box”可知,每盒平均所需要的包装时间是5分钟,故填packaging,表示“包装”。
转载请注明原文地址:https://tihaiku.com/zcyy/3718536.html
相关试题推荐
假冒伪劣。Forgeryandillegalimitationofbrand-nameproducts.原文四个字被译成了这么长的一句话。译文中应增
Thebest-sellerwoodentoyamongourproductsis【D1】________,whichisdesi
Thebest-sellerwoodentoyamongourproductsis【D1】________,whichisdesi
Thebest-sellerwoodentoyamongourproductsis【D1】________,whichisdesi
Thebest-sellerwoodentoyamongourproductsis【D1】________,whichisdesi
Wemusttryourbesttolowerthecostofourproducts.Otherwisethehighcostw
TheUnitedStatesexportsalotmore【D6】________thanitimports.Theseproducts
TheUnitedStatesexportsalotmore【D6】________thanitimports.Theseproducts
TheUnitedStatesexportsalotmore【D6】________thanitimports.Theseproducts
John:Whatplasticproductsdoyouhaveinmindthatareeasytorecycle?Tom:S
随机试题
有关结核病的治疗,以下哪项不正确A.链霉素能杀死酸性环境中生长、分裂、繁殖活跃的
下列贷款中,贷款期限上限最高的是()。A.商用车消费贷款 B.一般商业性助
最易误诊为腕关节脱位的骨折是:A.Colles骨折 B.Smith骨折
患者发热,口渴,胸闷,气粗,咯吐黄痰,喉间痰鸣,心烦,失眠,狂躁妄动,打人毁物,
期限在1年以上的资金的跨国流动是()。A.贸易资金的流动 B.套利性资金的
男性,37岁,支气管哮喘病史,突发极度呼吸困难就诊,拟诊为危重哮喘发作,查体示肺
根据《城乡规划法》规定,下列关于审批城乡规划的前置程序内容的表述中,不正确的是(
在施工进度控制目标体系中,用来明确各单位工程的开工和交工动用日期,以确保施工总进
急滩整治应优先采取()等措施。A.固滩 B.清礁 C.疏浚 D.筑坝
(2021年真题)关于施工成本核算的说法,正确的是()。A.施工成本核算包
最新回复
(
0
)