首页
登录
职称英语
The best-seller wooden toy among our products is【D1】________,which is desi
The best-seller wooden toy among our products is【D1】________,which is desi
游客
2024-08-13
33
管理
问题
The best-seller wooden toy among our products is【D1】________,which is designed for【D2】________.Our output per month is 4,000 items, and the average【D3】________ time per box is 5 minutes.We have 1,000 boxes in storage, and the next dispatch will come on November third.Currently, we have 20 drivers and 40 staff working on the【D4】________.All staff do【D5】________ work. [br] 【D3】
Well, the next product 1 want to move onto is children’ s toys.In this part of building, we manufacture several different wooden toys.But the greatest demand is for our train sets.These are made up of ten pieces and each piece is a different color.It’ s a toy for the under-fives and it sells well.We manufacture 1,000 of these every week.That’s a total production of 4, 000 a month.Over here, we put all the toys into boxes.Because this is a product for young children, everything has to be very carefully checked beforehand.So the average time it takes for packaging is 5 minutes per box.
We supply a lot of large department stores throughout the country.Orders are not constant, but go up and down depending on what time of the year it is.So we try to keep about 1,000 boxes in storage at any one time.That’ s the number that we have at the moment anyway.As I said, we deliver our children’ s toys to stores around the country.Outside, we’ re just loading up the lorries which are going to set off tomorrow.That’ s November third.Then there won’ t be another dispatch until 10th, November.
We have 20 drivers working in this area at the moment and we have 40 staff working on the production lines.As we need to work at night as well as during the day, everyone does some kind of shift work, though the hours vary according to area of production that they’ re working.
选项
答案
packaging
解析
根据录音中的“So the average time it takes for packaging is 5 minutes per box”可知,每盒平均所需要的包装时间是5分钟,故填packaging,表示“包装”。
转载请注明原文地址:https://tihaiku.com/zcyy/3718536.html
相关试题推荐
假冒伪劣。Forgeryandillegalimitationofbrand-nameproducts.原文四个字被译成了这么长的一句话。译文中应增
Thebest-sellerwoodentoyamongourproductsis【D1】________,whichisdesi
Thebest-sellerwoodentoyamongourproductsis【D1】________,whichisdesi
Thebest-sellerwoodentoyamongourproductsis【D1】________,whichisdesi
Thebest-sellerwoodentoyamongourproductsis【D1】________,whichisdesi
Wemusttryourbesttolowerthecostofourproducts.Otherwisethehighcostw
TheUnitedStatesexportsalotmore【D6】________thanitimports.Theseproducts
TheUnitedStatesexportsalotmore【D6】________thanitimports.Theseproducts
TheUnitedStatesexportsalotmore【D6】________thanitimports.Theseproducts
John:Whatplasticproductsdoyouhaveinmindthatareeasytorecycle?Tom:S
随机试题
Thereisstillavasteconomic______betweendevelopingcountriesandtheUnited
Igetalongbetterwithothers______________________________(既然我已消除了许多的内疚).n
下列属于所有权的继受取得方式的是( )。A.添附 B.先占 C.赠与 D
产伤性骨折中最常见的是A.颅骨骨折 B.锁骨骨折 C.肱骨骨折 D.股骨骨
葶苈大枣泻肺汤合泻白散适用于治疗蝶疮流注的证型是A.瘀热痹阻 B.脾肾两虚
某项目按照施工进度编制了施工成本计划,如下图所示,有关该图的描述,错误的是(
洞门墙应根据实际需要设置泄水孔和()。A.施工缝或伸缩缝 B.施工缝或沉降缝
甲是A期货公司的客户,经常委托A期货公司期货从业人员乙下单。某日甲临时出差,便委
阿昔洛韦用于肾功能不全患者应()A.避免应用 B.减量使用 C.加量使用
某招标项目的招标文件中规定了开始收受标书的时间为2010年3月9日,投标文件截止
最新回复
(
0
)