首页
登录
职称英语
Estimates were obtained from three contractors on the costs of covering the
Estimates were obtained from three contractors on the costs of covering the
游客
2024-07-04
43
管理
问题
Estimates were obtained from three contractors on the costs of covering the offices and class-rooms. All these three were in the $20,000 to $25,000 range. The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the over-time labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way.
Subject: (46)______ Costs for East Hall
Office and Classroom Installation:
1. Covering area: seven offices and two (47)______
2. Possible problem: some (48)______ might occur during a four- or five-day period
Additional Installation:
1. Budget: $6,000
2. A more powerful (49)______ is needed to handle the halls and stairways
3. Additional installation postponement will result in changes in (50)______ [br]
选项
答案
studio classrooms
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3662463.html
相关试题推荐
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Seenfromspace,ourearth,withwatercovering70%ofitssurface,appearsasa“bl
Biddingdocumentscanbeobtainedatthefollowingaddressuponreceiptofanon
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
______fromspace,ourearth,withwatercovering70%ofitssurface,appearsas
随机试题
Inthissection,youwillheararadiotalk.Thetalkwillbereadonlyonce.Fo
Goodafternoon,ladiesandgentlemen.Awarmwelcometoyouall.Mynameis
【教学过程】 (一)创设情境,导入新课 播放《铃儿响叮当》,了解歌曲背景,引出课题—《踏雪寻梅》。 师:这首歌曲是哪个国家的作品,你在什
无形资产收益法一般适合评估()。A.技术 B.顾客关系 C.商标 D
简述“学习档案袋”的内容与作用。
根据《幼儿园工作规程》,幼儿园品德教育的主要内容是()。 A.纪律教育和培养
影响违约损失率的因素包括()。A.项目因素 B.公司因素 C.行业因素
如果预期标的资产价格窄幅整理或下跌,可通过卖出看涨期权获利。()
城市污水处理工艺流程中,一级处理主要针对水中悬浮物质,常采用物理的方法,经过一级
《工业金属管道工程施工及验收规范》规定,阀门的壳体实验压力不得小于公称压力的(
最新回复
(
0
)