首页
登录
职称英语
Estimates were obtained from three contractors on the costs of covering the
Estimates were obtained from three contractors on the costs of covering the
游客
2024-07-04
52
管理
问题
Estimates were obtained from three contractors on the costs of covering the offices and class-rooms. All these three were in the $20,000 to $25,000 range. The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the over-time labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way.
Subject: (46)______ Costs for East Hall
Office and Classroom Installation:
1. Covering area: seven offices and two (47)______
2. Possible problem: some (48)______ might occur during a four- or five-day period
Additional Installation:
1. Budget: $6,000
2. A more powerful (49)______ is needed to handle the halls and stairways
3. Additional installation postponement will result in changes in (50)______ [br]
选项
答案
the pipe way
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3662460.html
相关试题推荐
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Seenfromspace,ourearth,withwatercovering70%ofitssurface,appearsasa“bl
Biddingdocumentscanbeobtainedatthefollowingaddressuponreceiptofanon
Seenfromspace,ourearth,withwatercovering70%ofitssurface,appearsasa
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
随机试题
Whosponsoredtheconferenceonpopulation?[br][originaltext]Atwenty-year
Whichofthefollowingsentenceshasanobjectcomplement?A、Theyservedmeatri
Websterdefinesadviceasbeing"arecommendationwithregardtoacourseof
Whatisoneservicethatbanksdonotprovide?[br][originaltext]M:Hello,Sus
Yearsago,doctorsoftensaidthatpainwasanormalpartoflife.Inpartic
根据《水利工程设计概(估)算编制规定》,下列属于建筑及安装工程费中基本直接费的有
以下加密算法中适合对大量的明文消息进行加密传输的是( )A.RSA B.SH
A.药学或相关专业的学历,或者具有药学专业技术职称B.药学专业技术职称C.相应的
下表显示我国2011年规模以上主要几类工业企业实现利润(单位:亿元)及其增长速度
根据合同实施偏差分析的结果,承包商应采取相应的调整措施,其中变更技术方案,采用新
最新回复
(
0
)