首页
登录
职称英语
Estimates were obtained from three contractors on the costs of covering the
Estimates were obtained from three contractors on the costs of covering the
游客
2024-07-04
25
管理
问题
Estimates were obtained from three contractors on the costs of covering the offices and class-rooms. All these three were in the $20,000 to $25,000 range. The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the over-time labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way.
Subject: (46)______ Costs for East Hall
Office and Classroom Installation:
1. Covering area: seven offices and two (47)______
2. Possible problem: some (48)______ might occur during a four- or five-day period
Additional Installation:
1. Budget: $6,000
2. A more powerful (49)______ is needed to handle the halls and stairways
3. Additional installation postponement will result in changes in (50)______ [br]
选项
答案
Air-conditioning Installation
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3662459.html
相关试题推荐
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
(see)______fromspace,ourearth,withwatercovering70%ofitssurface,appear
Seenfromspace,ourearth,withwatercovering70%ofitssurface,appearsasa“bl
Biddingdocumentscanbeobtainedatthefollowingaddressuponreceiptofanon
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
随机试题
AllathletespursuethespiritofOlympicsand____________(它所代表的一切).allitst
并联管网的各并联管段()。A.水头损失相等 B.水力坡度相等 C.总能量
因公司进行一个项目其包含A,B,C,D,E,F,G七个活动,各活动的历史估算和活
男性,52岁。因患十二指肠球部溃疡合并幽门不全梗阻入院施行胃大部切除术。术中出血
糖化血红蛋白测定的临床意义为反映糖尿病患者A.近半年内血糖总的水平 B.近2~
在运动生理学研究的基本方法中,让受试者按照一定研究目的而设计的实验方案称为(
B
甲公司为境内上市公司,2×17年度及以前年度适用的企业所得税税率为15%,2×1
肝细胞弥漫性水样变性主要见于( )。A.急性重型肝炎 B.亚急性重型肝炎
根据《质量管理体系》,建设工程质量控制的定义是()。 A.参与工程建
最新回复
(
0
)