首页
登录
职称英语
Estimates were obtained from three contractors on the costs of covering the
Estimates were obtained from three contractors on the costs of covering the
游客
2024-07-04
14
管理
问题
Estimates were obtained from three contractors on the costs of covering the offices and class-rooms. All these three were in the $20,000 to $25,000 range. The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the over-time labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way.
Subject: (46)______ Costs for East Hall
Office and Classroom Installation:
1. Covering area: seven offices and two (47)______
2. Possible problem: some (48)______ might occur during a four- or five-day period
Additional Installation:
1. Budget: $6,000
2. A more powerful (49)______ is needed to handle the halls and stairways
3. Additional installation postponement will result in changes in (50)______ [br]
选项
答案
Air-conditioning Installation
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3662459.html
相关试题推荐
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
(see)______fromspace,ourearth,withwatercovering70%ofitssurface,appear
Seenfromspace,ourearth,withwatercovering70%ofitssurface,appearsasa“bl
Biddingdocumentscanbeobtainedatthefollowingaddressuponreceiptofanon
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
随机试题
Soonaftertheshooting,"NoTrespassing"signsappearedin______colorsaround
所含单位工程合格,该合同段评定为合格;所含合同段合格,该建设项目评定为合格。
某同学分别在距地面不同高度h1、h2处将一小球以大小V1和v2的水平速度抛出.小
周老师在美术课后,经常撰写教学案例、日志、反思记录等用以研究教学。这些研究的呈现
某学生对其全班同学的学习成绩(保留小数)采用如下分组,正确的是()。A.30
派氏指数与拉氏指数相比,特点有()。A.主要受报告期商品(产品)结构的影响 B
个人住房贷款的流程包括()。A.受理和调查一签约和发放一审查与审批一贷后与档案
课外活动的主体是()。 A.教师 B.学生 C.少先队组织 D.学校管理
患者,女,60岁。患肥胖症,检查可见TG2.0mmol/L。主要降低TG的下列
在工程施工准备阶段的质量控制中,图纸会审由( )整理会议纪要,与会各方会签。A
最新回复
(
0
)