首页
登录
职称英语
Estimates were obtained from three contractors on the costs of covering the
Estimates were obtained from three contractors on the costs of covering the
游客
2024-07-04
30
管理
问题
Estimates were obtained from three contractors on the costs of covering the offices and class-rooms. All these three were in the $20,000 to $25,000 range. The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the over-time labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way.
Subject: (46)______ Costs for East Hall
Office and Classroom Installation:
1. Covering area: seven offices and two (47)______
2. Possible problem: some (48)______ might occur during a four- or five-day period
Additional Installation:
1. Budget: $6,000
2. A more powerful (49)______ is needed to handle the halls and stairways
3. Additional installation postponement will result in changes in (50)______ [br]
选项
答案
Air-conditioning Installation
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3662459.html
相关试题推荐
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
(see)______fromspace,ourearth,withwatercovering70%ofitssurface,appear
Seenfromspace,ourearth,withwatercovering70%ofitssurface,appearsasa“bl
Biddingdocumentscanbeobtainedatthefollowingaddressuponreceiptofanon
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
随机试题
PASSAGETHREE[br]HowdoestheauthorfeelaboutDr.Luider’sstudy?Optimistic.
Theconceptionofpovertyandwhatto【C1】______aboutithavechangedoverth
Theoilpricemovedcloserto$50abarrelforthefirsttimesinceNovember,on
按照同步光纤网传输标准(SONET),0C-1的数据速率为()Mb/s.A.
特高频局放干扰信号的主要排除方法有()(A)背景干扰测量屏蔽法(B)滤波
下列文学作品中,不属于莫言作品的是()。 A.《丰乳肥臀》B.《活着》C
生产控制的基本程序主要包括()A.确定控制的标准 B.根据标准检验实际执行
中国气象部门规定,24小时降水量为()毫米或以上的雨称为“暴雨”。但由于各地降水
2007~2013年间,平均每万人群众文化设施建筑面积同比增速高于10%的年份有
男,15岁。因双侧颞下颌关节强直已行颞下颌关节假关节成形术,开始张口训练的时间应
最新回复
(
0
)