首页
登录
职称英语
Water power stations are built______big waterfalls and where the water runs fast
Water power stations are built______big waterfalls and where the water runs fast
游客
2024-06-26
22
管理
问题
Water power stations are built______big waterfalls and where the water runs fast.
选项
A、which are
B、which has
C、where there have
D、where there are
答案
D
解析
分析句子结构可知,空格所填词应和big waterfalls…fast一起构成状语从句,空格前没有表示地点的先行词,因此从句的引导词应用where。表示“哪里有什么”应当用there be结构,且空格后为复数名词big waterfalls,故be动词为复数形式。因此答案选D)。
转载请注明原文地址:https://tihaiku.com/zcyy/3650296.html
相关试题推荐
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt________bigwaterfallsandwherethewaterruns
随机试题
Whileradiobroadcastingwasstill【C1】______itsearlystagethewonderof
Thehistoryofmodernwaterpollutiongoes【C1】______toFebruary20,1931,
Cybercrime’Lovebug’virus,hackattacksanddatatheft,peoplenowadaysar
Therewasatimewhencollegewasaplacewhereyoungadultscouldexpandth
出现柏油样便,提示消化道出血量在( )。A.5~20ml B.30~40ml
治疗缺血性中风肝肾阴虚,肝风内动型,虚首选A.镇肝熄风汤 B.天麻钩藤饮 C
请以“秋天的落叶”为内容写一个教学活动设计。
培训成果转化的四个层面中.()的转移要求受训者的培训情况和工作环境完全符合。A
下列森林生态功能中,属于生态服务功能的有( )。A.保持水土 B.涵养水源
下列有关工程造价的基本概念的说明中,正确的是()。A.建设项目工程造价就是建设
最新回复
(
0
)