首页
登录
职称英语
Water power stations are built______big waterfalls and where the water runs fast
Water power stations are built______big waterfalls and where the water runs fast
游客
2024-06-22
14
管理
问题
Water power stations are built______big waterfalls and where the water runs fast.
选项
A、which are
B、which has
C、where there have
D、where there are
答案
D
解析
本题考查状语从句。分析句子结构可知,空格所填词应和big waterfalls…fast一起构成状语从句,空格前没有表示地点的先行词,因此从句的引导词应用where。表示“哪里有什么”应当用there be结构,且空格后为复数名词big waterfalls,故be动词为复数形式。因此答案选D)。
转载请注明原文地址:https://tihaiku.com/zcyy/3644781.html
相关试题推荐
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt________bigwaterfallsandwherethewaterruns
随机试题
Ascientistwhodoesresearchineconomicpsychologyandwhowantstopredic
TherecessionistakingaserioustollonAmericanretail,bute-commerceco
(1)LondonmaybeEurope’scommercialcapital,butnotallBritonsarethrill
现场测定土的抗剪强度指标可采用:A.固结试验 B.平板载荷试验 C.标准贯入
A.5次 B.4次 C.3次 D.2次 E.1次学龄前期(3~7岁)每年
球结膜水肿见于A、肝炎 B、颅内高压 C、沙眼 D、高血压不伴颅内高压
关于建设工程项目合同类型的描述,错误的是()。A、项目总承包合同是业主方与施工
凯恩斯认为,由交易动机和预防动机引起的货币需求主要取决于( )。A.利率 B
某施工企业拥有一处办公楼,评估价为5000万元。该施工企业从A银行贷款3000万
某施工单位承接了某一级公路工程施工合同段,包含E3标段(K15+000~K1
最新回复
(
0
)