首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2024-05-13
20
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway. The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains.
This is all different on the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; and it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots".
The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop. Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots. Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、Railway workers.
B、A robot.
C、A computer.
D、A machine.
答案
D
解析
On the Victoria Line,who does all the work of checking and collecting tickets?
转载请注明原文地址:https://tihaiku.com/zcyy/3597113.html
相关试题推荐
[originaltext]M:Hills,areyougoingtoJack’spartytonight?MaybeIcangive
[originaltext]Theworld’sfirstcompletelyautomaticrailwayhasbeenbuilt
[originaltext]Theworld’sfirstcompletelyautomaticrailwayhasbeenbuilt
[originaltext]W:ThisisFridaandthisisherhusbandDiegoRivera.Shecan’t
[originaltext]W:ThisisFridaandthisisherhusbandDiegoRivera.Shecan’t
[originaltext]M:Isn’titrathercoldoutside,Sally?W:Itisabit,butIcan
[originaltext]M:Isn’titrathercoldoutside,Sally?W:Itisabit,butIcan
[originaltext]M:Isn’titrathercoldoutside,Sally?W:Itisabit,butIcan
[originaltext]M:Isn’titrathercoldoutside,Sally?W:Itisabit,butIcan
[originaltext]YoucouldsaythatJosephCornellbecameanartistbecauseof
随机试题
ThedayofprotestingatEnglishWikipediabroughtmeasurableresults,1.___
Accordingtothespeaker,whatisthedistinctivecharacteristicofgoodjazzmu
Afewdegreescanmakeabigdifferencewhenitcomestofoodstorage.Foods
A. B. C. D.
下列关于项目管理工作任务分工表的说法,正确的是()。A:工作任务分工表反映项目
在大样本的情况下,检验H0:μ≤μ0,H1:μ>/μ0,则()成立时,可接受原
A.切开引流 B.病灶清除,填塞换药 C.病灶清除后,关闭切口,置管定时注入
下列作品不是选自《一千零一夜》的是( )。A.《死神的故事》 B.《阿里巴巴
丹参的功效是A.破血祛瘀止痛 B.活血祛瘀,润肠通便 C.活血祛瘀,利水消肿
在工程网络计划的执行过程中,当某项工作进度出现偏差后,需要调整原进度计划的情况有
最新回复
(
0
)