首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-02-06
12
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] The word "evaporate"(Line 7, Para. 3)means_____.
选项
A、steam
B、strengthen
C、flow out
D、harden
答案
A
解析
词汇题。根据上下文来推测词义。根据the ponds are left to evaporate,uncovering piles of dried tailings可判断出由于池塘里的液体蒸发没有了,废料才露了出来。故选项A正确。
转载请注明原文地址:https://tihaiku.com/zcyy/3426338.html
相关试题推荐
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
随机试题
Completetheformbelow.WriteNOMORETHANTWOWORDSAND/ORANUMBERforeacha
[audioFiles]audio_ehbm_j25001(20082)[/audioFiles]A、Doinghomework.B、Fine,than
Foryears,highschoolstudentshavereceivedidenticaltextbooksastheirc
[originaltext]Savingmoneyisafirststeptowardwealth.Puttingmoneyawa
在HTML文件中,()标记在页面中显示work为斜体字。A.<pre>wor
子宫肌瘤迅速增大,应考虑:A、感染 B、囊性变 C、红色变性 D、脂
偷工减料∶诚信A.难舍难分∶友谊 B.逆来顺受∶温和 C.冥思苦想∶愚笨
某大型冷库在建工程,施工现场需要进行动火作业。根据现行国家标准《建设工程施工现场
(2011年)某拟建项目设计排气筒高度为7.5m,二甲苯排放浓度为40mg/m3
建设工程质量监督档案归档前,应由()签字。A.质量监督机构负责人 B.项目业
最新回复
(
0
)