首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-02-07
35
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] According to the passage, all of the following are sources of radioactive waste EXCEPT______.
选项
A、bomb production
B、nuclear fusion experiments
C、nuclear power plant operation
D、uranium mining operations
答案
B
解析
细节题。作者在第三段提到核废料的来源有:Powerplants andbomb—making are notthe only sources ofwaste.Uranium mining and milling operations…显然没有提到B选项的内容,故选B。
转载请注明原文地址:https://tihaiku.com/zcyy/3429454.html
相关试题推荐
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
随机试题
HowtheSmallpoxWarWasWonTheworld’slastknown
[audioFiles]2021m5x/audio_ve01005j_ezflisteningxa_0144_202105[/audioFiles]
C
伪造、擅自制造他人注册商标标识,情节特别严重的,应判处()有期徒刑并处罚金。A
如用白、灰、黑三种颜色的油漆将正方体盒子的6个面上色,且两个相对面上的颜色都一
根据货币时间价值概念,下列不属于货币终值影响因素的是()。A.计息的方法 B
患者女,35岁,早孕终止妊娠行负压吸引术,术中出现面色苍白,出冷汗,头晕,胸闷,
下列控制指标中不属于使用强度控制指标的是?A.容积率 B.建筑高度 C.建筑
A.3~6个月 B.1~2岁 C.4~6岁 D.9~11岁 E.16岁以
我国实行土地用途管理制度,国家土地利用总体规划的土地用途分为()。A.农用地、工
最新回复
(
0
)