首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-02-06
12
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] According to the passage, all of the following are sources of radioactive waste EXCEPT______.
选项
A、bomb production
B、nuclear fusion experiments
C、nuclear power plant operation
D、uranium mining operations
答案
B
解析
细节题。作者在第三段提到核废料的来源有:Power plants and bomb-making are not the only sources of waste.Uranium mining and milling operations…显然没有提到B选项的内容,故选B。
转载请注明原文地址:https://tihaiku.com/zcyy/3426336.html
相关试题推荐
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
随机试题
下列各项经济业务中,不影响企业资产总额变动的业务是()。A.从银行借入三年期借款
()致力于知识的自动发现。A.数据挖掘技术 B.数据仓库技术 C.联机
下列各项中,不属于内部审计程序的有:A.向社会公布审计结果 B.分级复核审计报
下列业务中,属于增值税修理修配劳务的是(??)。A.钟表维修 B.住宅装修
洁净室的顶棚、壁板及夹芯材料应为不燃烧体,且不得采用有机复合材料。顶棚和壁板的耐
2020年12月31日,企业某项固定资产的公允价值为1000万元
下列各项中,关于期间费用的处理正确的有()。A.董事会会费应计入管理费用
(2017年真题)下列招标情形中,属于以不合理条件限制、排斥潜在投标人或者投标人
根据《公路水运工程施工安全标准化指南》,不属于危险性较大的分部分项工程是()。
沥青混合料结构组成中,骨架-空隙结构的特点是()。A.黏聚力较高,内摩擦角较小
最新回复
(
0
)