首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-02-07
33
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] The word "evaporate"(Line 6, Para. 3)means______.
选项
A、steam
B、strengthen
C、flow out
D、harden
答案
A
解析
含义题。根据上下文来推测词义。根据the ponds are left to evaporate,uncovering piles of dried tailings.可判断出由于池塘里的液体蒸发没有了,废料才露了出来。故选项A正确。
转载请注明原文地址:https://tihaiku.com/zcyy/3429456.html
相关试题推荐
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
随机试题
Thelithiumbatteriesarebecomingimproperforthecellphonebecause______.[
以下关于程序设计语言的叙述中,错误的是()。A.程序设计语言的基本成分包括数据
控制图中的控制上限和控制下限标明()。A.客户将要接受的界限 B.可能出
()是以实物数量和货币标准为计量单位,综合反映竣工项目从筹建开始到项目竣工交付
能够满足广大人民群众基本医疗保健的预防与临床治疗需要,是国家基本药物原则中的哪一
失代偿的代谢性酸中毒时不会出现A.COCP降低B.参考碳酸盐及缓冲碱明显减少C.
近年来,国家统计局公布的CPI数据成为反映社会经济生活状况的“晴雨表”。下列关于
商品从生产领域向消费领域转移过程中所经历的交易行为称为( )。 A.商品流
由于电信运营项目自身的特点,使其后评价存在特有的难点,下列不属于此难点的是()。
对于慢性肾盂肾炎的临床表现,下列哪项是错误的A.可无全身症状 B.尿路刺激征可
最新回复
(
0
)