An office tower on Miller Street in Manchester is completely covered in solar

游客2024-01-26  19

问题    An office tower on Miller Street in Manchester is completely covered in solar panels. They are used to create some of the energy used by the insurance company inside. When the tower was first【C1】______in 1962, it was covered with thin square stones. These small square stones became a problem for the building and continued to fall off the face for 40 years until a major renovation was【C2】______During this renovation the building’s owners, CIS,【C3】______the solar panel company, Solarcentury. They agreed to cover the entire building in solar panels. In 2004, the completed CIS tower became Europe’ s largest【C4】______of vertical solar panels. A vertical solar project on such a large【C5】______has never been repeated since.
   Covering a skyscraper with solar panels had never been done before, and the CIS tower was chosen as one of the "10 best green energy projects". For a long time after this renovation project, it was the tallest building in the United Kingdom, but it was【C6】______overtaken by the Millbank Tower.
   Green buildings like this aren’ t【C7】______cost-efficient for the investor, but it does produce much less pollution than that caused by energy【C8】______through fossil fuels. As solar panels get【C9】______, the world is likely to see more skyscrapers covered in solar panels, collecting energy much like trees do. Imagine a world where building the tallest skyscraper wasn’ t a race of【C10】______, but rather one to collect the most solar energy.
   A) cheaper        I) eventually
   B) cleaner         J) height
   C) collection       K) necessarily
   D) competed       L) production
   E) constructed      M) range
   F) consulted        N) scale
   G) dimension       O) undertaken
   H) discovered [br] 【C4】

选项

答案 M

解析 空格前为形容词最高级largest,空格后为介词of,故本空只能填入一个名词。结合句意可知,2004年,翻修后的独联体大楼拥有欧洲最大范围的垂直太阳能电池板。备选项中只有range(范围)与上下文衔接紧密,故答案为M。