首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-01-22
27
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] The central idea of the passage is to point out potential problems regarding______.
选项
A、effects of high-level radiation
B、operation of nuclear power plants
C、fallout from the explosion of unclear weapons
D、various sources of radioactive wastes
答案
D
解析
主旨题。作者在短文第一句就指出了主题:The most pressing nuclear energy issue is the disposal of nuclear waste.关键词是“核废料”nuclear waste。故选项D正确。
转载请注明原文地址:https://tihaiku.com/zcyy/3384949.html
相关试题推荐
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
[originaltext](5)(6)SouthKoreahasshutdowntwonuclearreactorsafter
[originaltext](5)(6)SouthKoreahasshutdowntwonuclearreactorsafter
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
A、Tolowerthecostsofhaulingfoodwaste.B、Tosavemorefoodfortheworld.C
随机试题
Time-SavingTech1.Theweb-Turnthepage-【T1】__
[originaltext]W:Dr.Thomas?ThisisKeetBradleyfromthedailynews.[5]I’dl
软件测试可以在概念上分为三个大的测试阶段:单元测试、集成测试和系统测试。以下叙述
()是金融市场上最重要的中介机构,是储蓄转化为投资的重要渠道。A.政府 B.
某消防检测机构对气体灭火系统进行联动调试,下列调试结果不符合规范要求的是()。A
下列有关审计证据充分性的说法中,错误的是( )。A.评估的重大错报风险越高,需
(2017年、2016年真题)资产负债表日企业按工资总额的一定比例计提的基本
项目监理机构对施工单位报送的工程开工报审表及相关资料进行审查的内容有( )。A、
某化工漆料仓储公司是储存硝基类、醇类和苯类稀料的专业仓储公司。公司应把危险有害因
慢性支气管炎急性发作期治疗最主要的措施是() A.止咳祛痰 B.控制感染
最新回复
(
0
)