首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-01-22
50
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] The central idea of the passage is to point out potential problems regarding______.
选项
A、effects of high-level radiation
B、operation of nuclear power plants
C、fallout from the explosion of unclear weapons
D、various sources of radioactive wastes
答案
D
解析
主旨题。作者在短文第一句就指出了主题:The most pressing nuclear energy issue is the disposal of nuclear waste.关键词是“核废料”nuclear waste。故选项D正确。
转载请注明原文地址:https://tihaiku.com/zcyy/3384949.html
相关试题推荐
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
[originaltext](5)(6)SouthKoreahasshutdowntwonuclearreactorsafter
[originaltext](5)(6)SouthKoreahasshutdowntwonuclearreactorsafter
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
A、Tolowerthecostsofhaulingfoodwaste.B、Tosavemorefoodfortheworld.C
随机试题
TheRomansledbyJulesCaesarlaunchedtheirfirstinvasiononBritainin______
Idon’tbelieveyouarewrong,______?A、dotheyB、aren’ttheyC、areyouD、don’t
OneofthestrangestandmostfascinatingthingsaboutScotlandistheLoch
在工程网络计划的执行过程中,监理工程师检查进度时,只发现某工作的实际进度比其计划
大量出汗时,尿量减少是由于:A.血浆晶体渗透压升高,ADH释放增多 B.血浆晶
格列本脲的化学结构式
患者男,60岁。因肝硬化并发上消化道出血,出现言语不清,举止反常,定向力和理解力
监控培训的(),可评估受训者在不同培训阶段的提高和进步幅度,及时发现差距并采取补
某公司2009年10月接受捐赠小汽车10辆,该小汽车为1.8升排量,成本为100
A.果糖二磷酸酶-1 B.6-磷酸果糖激酶-1 C.HMG-CoA还原酶
最新回复
(
0
)