首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-01-22
70
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] It can be inferred from the passage that the most dangerous by-product of uranium mining and milling is______.
选项
A、solid mining wastes
B、the slurry in which the waste is stored
C、the radon gas that is emitted by the waste
D、the uranium that is recovered in the mining operations
答案
C
解析
推断题。选项中的内容在文中均有提及,但是从危害性上讲,选项A、B、D都没有直接说到它们的害处,而文中第三段讲到Uncovered piles of tailings give off radioactive radon gas.Once in the air,the gas finds its way into the water supply and thefood chain.故可推断出这种放射性气体才是最有害的。故选项C正确。
转载请注明原文地址:https://tihaiku.com/zcyy/3384948.html
相关试题推荐
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
SixSecretsofHigh-EnergyPeopleA)There’sanenergycrisis
[originaltext](5)(6)SouthKoreahasshutdowntwonuclearreactorsafter
[originaltext](5)(6)SouthKoreahasshutdowntwonuclearreactorsafter
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
随机试题
Peoplespendagreatdealoftime,money,andenergytoseeorreadaboutmo
Educatorstodayaremoreandmoreoftenheardtosaythatcomputerliteracyi
[originaltext]M:Hi,Linda!Ihaven’tseenyouforalongtime.Whathaveyoub
过程改进计划详细说明了对项目管理过程和产品开发过程进行分析的各个步骤,有助于识别
下列选项中,符合我国宪法规定的公民基本权利的有()A.公民张某享有合法出版其绘画
预算控制属于行政事业单位内部控制的一种方法。()
建设项目验收委员会或验收组的主要职责和任务是()。A:听取建设项目业主全面工作
(2018年5月)新产品销售额在总销售额中所占的比例,是平衡计分卡中()方面的指
脾运化水液的生理功能,主要是指对水液的A.吸收 B.传输 C.布散 D.排
Ⅱ型肺结核是指() A.原发型肺结核 B.浸润型肺结核 C.结核性胸膜炎
最新回复
(
0
)