首页
登录
职称英语
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] The instructor
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] The instructor
游客
2024-01-04
20
管理
问题
Art Murals
[br] The instructor briefly explains how moisture damages a mural. Indicate whether each sentence below is a part of the process. For each sentence, click in the correct box.
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
答案
Yes: Moisture seeps through the wall and dissolves salts in the wall material: When water leaks through a wall, it may dissolve the salts that are in the building materials.
No: The plaster dries more quickly than the paint: Not mentioned in the discussion.
No: An air space between the interior and exterior walls insulates the mural: ...an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture
Yes: Dried salt deposits form a white film on the mural: When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. (2.6)
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3332174.html
相关试题推荐
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentothelectureinbusinessclass[img]2011q1/ct_etoefm_etoef
NarratorListentothelectureinbusinessclass[img]2011q1/ct_etoefm_etoef
[img]2011q1/ct_etoefm_etoefspeaka_0336_20111[/img]Q:Describeasituationinwhi
BiologyCardiacMuscle[img]2012q1/ct_etoefm_etoeflistz_0107_20121[/img][br]Bas
BiologyCardiacMuscle[img]2012q1/ct_etoefm_etoeflistz_0107_20121[/img][br]Why
随机试题
Howdopeoplecelebratethatfestivalinyourcountry? Inthisfestival,people
甲公司和乙公司均为手机生产商。甲公司规模大,市场占有率高,乙公司规模小,但是有一
根据《物权法》的规定,可以质押的权利包括( )。A.汇票、支票、本票、债券 B
女性,55岁。右耳垂下无痛性肿块逐渐缓慢长大6年。触诊肿块界线清楚,活动,约4c
关于对ARDS患者的治疗原则,下列不正确的是()。A.延长机械通气时间 B.选
根据《政府采购货物和服务招标投标管理办法》的规定,属于综合评估法的有()A.最
来源于橘属(Citrus)植物的中药材有A.枳壳 B.陈皮 C.青皮 D.
银行承兑汇票的承兑银行,应当按照票面金额向出票人收取()的手续费。A:千分之一
(2018年真题) 【背景资料】 某开发商投资兴建办公楼工程,建筑面积96
某工程基础平面图如图6.I.1所示,现浇钢筋混凝土带形基础、独立基础的尺寸如图6
最新回复
(
0
)