首页
登录
职称英语
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] The instructor
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] The instructor
游客
2024-01-04
36
管理
问题
Art Murals
[br] The instructor briefly explains how moisture damages a mural. Indicate whether each sentence below is a part of the process. For each sentence, click in the correct box.
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
答案
Yes: Moisture seeps through the wall and dissolves salts in the wall material: When water leaks through a wall, it may dissolve the salts that are in the building materials.
No: The plaster dries more quickly than the paint: Not mentioned in the discussion.
No: An air space between the interior and exterior walls insulates the mural: ...an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture
Yes: Dried salt deposits form a white film on the mural: When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. (2.6)
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3332174.html
相关试题推荐
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentothelectureinbusinessclass[img]2011q1/ct_etoefm_etoef
NarratorListentothelectureinbusinessclass[img]2011q1/ct_etoefm_etoef
[img]2011q1/ct_etoefm_etoefspeaka_0336_20111[/img]Q:Describeasituationinwhi
BiologyCardiacMuscle[img]2012q1/ct_etoefm_etoeflistz_0107_20121[/img][br]Bas
BiologyCardiacMuscle[img]2012q1/ct_etoefm_etoeflistz_0107_20121[/img][br]Why
随机试题
YouwillhearaninterviewwithEueWoods.Foreachquestion(23-30),mar
[originaltext]ZacharyTaylorwaselectedasthe12thPresidentin1849.(23)It
简述正确理解学习的心理实质。
被撤销教师资格的,自撤销之日起,3年内不得重新申请认定教师资格。( )
不同基金的投资目标比较基准等均有差别。因此基金的表现不能看回报率。以下不属于基金
财政支出中的社会保障支出、财政补贴支出属于:A.购买性支出 B.转移性支出
商品A价格上升导致商品B需求曲线右移,则商品A和B()。A.互为替
现代的脑成像技术中具有无创性优点,对人体基本无害的有A.正电子发射层析照相术
人在每一瞬间,将心理活动选择了某些对象而忽略了另一些对象。这一特点指的是注意的(
根据《招标投标法实施条例》,下列关于招标代理机构的描述不正确的是( )。A.招标
最新回复
(
0
)