首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2023-12-29
22
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] Designing and implementing such a system may not cause engineering problems.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
B
解析
根据原文“…poses interesting engineering problems”判断,本题表述错误。
转载请注明原文地址:https://tihaiku.com/zcyy/3315162.html
相关试题推荐
TheproblemofaccuratelyassessingtheroleofEnglishincontemporaryresearch
Thelocalgovernmentleadersaremakingeveryeffortto_________theproblemof
Tomcreditshisfatherforhis_________withtheresearchofsocialproblems.A、oc
Theproblemsthemselvesarestillnottrulystrategicbecausetheoperationoft
Peoplehadbeenconsciousoftheproblembefore,butthenewbookmadethemawar
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
WhatdoesthespeakerthinkaboutPeter’sopinionoftheproblem?[br][origina
WhatdoesthespeakerthinkaboutPeter’sopinionoftheproblem?[originaltext]
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
随机试题
Whatistheprobablerelationshipbetweenthetwospeakers?[br][audioFiles]au
Ihavejusthavemycomputerrepaired.Howmuchdidthey______forit?A、payB、ta
铸铁散热器与钢制散热器相比,不存在的优点是()。A.加工制造成本低 B.耐
在沥青与粗集料的黏附性试验中,以下()情况黏附性等级为3。A.沥青膜少部分被水
设备缺陷的处理时限规定:严重缺陷处理不超过()。1天$;$1周$;$2周$;$1
基金的重大事件包括()。A:基金份额持有人大会的召开 B:提前终止基金合同期限
符合桩冠的适应证是A.根管壁侧穿 B.已作根管治疗,瘘管口未闭 C.作固定义
不能促使承包商降低工程成本,甚至还可能“鼓励”承包商增大工程成本的合同形式是()
某砂轮工于冬季因右手手麻、手痛、夜间疼痛加剧影响睡眠,而赴医院诊治上题对该工厂砂
关于单价合同中承包商风险的说法,正确的是()。A.单价合同中承包商存在工程
最新回复
(
0
)