首页
登录
职称英语
PASSAGE FOURBecause production lines at Boeing and Airbus are fully booked.根据题目中
PASSAGE FOURBecause production lines at Boeing and Airbus are fully booked.根据题目中
游客
2023-11-27
60
管理
问题
PASSAGE FOUR
选项
答案
Because production lines at Boeing and Airbus are fully booked.
解析
根据题目中的Delta and Northwest和replace their ageing aircrafts定位到第5段第1句。该句提到,达美和西北近期没有裁掉一线员工或更换老龄机队的余地,破折号后的内容是原因:波音和空客的生产线上,订单已经满满当当,故答案为Because production lines at Boeing and Airbus are fully booked。
转载请注明原文地址:https://tihaiku.com/zcyy/3223681.html
相关试题推荐
PASSAGETHREE[br]Whatisthemainargumentofthispassage?Femalementorscan
PASSAGETHREE[br]Whatdoesthefirst"it"in"itjustpreservedit"referto
PASSAGETWO[br]Whatisthispassagemainlyabout?ThepredictionOntheU.K.’s
PASSAGETWO[br]WhatdidKathrinMuehlbronnerpredictaboutinPara.3?Possible
PASSAGEONE[br]Whatdid"I"meanbysaying"mycuriositywasnotaltogetheran
PASSAGETHREE[br]Accordingtotheauthor,whichstrategymaynotworkwellfor
PASSAGETHREE[br]What’stheauthor’smainargumentinPara.4andPara.5?Larg
PASSAGETWO[br]AccordingtoPara.3toPara.6,whatisthecurrentopinionab
PASSAGEONE[br]Whyisthefemalecharacterchangedfrom"wife"to"girl"inth
PASSAGETHREE[br]WhatattributeaboutDenimcanbelearnedfromthemanyUSPr
随机试题
[originaltext]Inthecaseofmobilephones,changeiseverything.Recentre
[originaltext]AttheUniversityofKansasartmuseum,investigatorstested
(1)Pageants(露天演出)areusuallyconceivedonafairlylargescale,oftenunde
连部安排甲、乙、丙三个班完成某项工程,甲班单独工作需要4天,乙班单独工作需要6天
下列分子中,属于极性分子的是:
如果澄清发出的时间距投标截止时间不足( ),则需相应推迟投标截止时间。 A、
当采用沥青混凝土面层时,在下列情况中,应浇洒透层沥青的是( )。 A、多层热
下列工序中,不属于电缆敷设施工程序的是( )。 A、电缆验收 B、电缆绝
按份共有人按照其()均可以对共有财产进行占有、使用、收益及处分。A:约定 B:
某产妇经吸引器助产,娩出一男婴,发生新生儿窒息,首选的措施是()A.
最新回复
(
0
)