The construction of the second-ring viaduct has been ______ for three months.A、o

游客2023-11-19  21

问题 The construction of the second-ring viaduct has been ______ for three months.

选项 A、on the way
B、under way
C、at the way
D、to the way

答案 B

解析 此题考查词组搭配。under way意思是“进行中,在行进";on the way意思是“在途中,接近”。C和D不是固定搭配。
转载请注明原文地址:https://tihaiku.com/zcyy/3201718.html
最新回复(0)