To: Robert Williams, School of Architecture
From: James. Johnson
Subject: Air-conditioning Installation Costs for East Hall
Date: June 4, 2006
I am writing to inform you of the costs of installing air-conditioning for the seven offices and two studio classrooms in East Hall.
Office and Classroom Installation
Estimates were obtained from three contractors on the costs of covering the offices and classrooms. All these three were in the $20,000 to $25,000 range. The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the overtime labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would he necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way.
Subject: (46) Costs for East Hall
Office and Classroom Installation
1. Covering area: seven offices and two (47)
2: Possible problem: some (48) might occur during a four- or five-day period
Additional Installation:
1. Budget: $6,000
2. A more powerful (49) is needed to handle the halls and stairways
3. Additional installation postponement will result in changes in (50)
选项
答案
Air-conditioning Installation
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3049873.html
相关试题推荐
Aftermakingaspeechabouttheschool,Mr.Whitewenton(show)______thevisito
IshouldsaythatteachingEnglishinChinaisarealjob,andtheschools【B1
IshouldsaythatteachingEnglishinChinaisarealjob,andtheschools【B1
IshouldsaythatteachingEnglishinChinaisarealjob,andtheschools【B1
To:RobertWilliams,SchoolofArchitectureFrom:James.JohnsonSubjec
To:RobertWilliams,SchoolofArchitectureFrom:James.JohnsonSubjec
To:RobertWilliams,SchoolofArchitectureFrom:James.JohnsonSubjec
To:RobertWilliams,SchoolofArchitectureFrom:James.JohnsonSubjec
Theyfinallymadea_______tobuildanewschoolinthatarea.(decide)decision不定
[originaltext]IsthatMr.RobertLee?[/originaltext][originaltext]Thankyoufo
随机试题
Thepassageischieflyconcernedwith______[br]Itcanbeinferredfromthepas
______[br][originaltext]SentenceNo.1Peopleoftenusetheexcuse;"Iamto
ThedayofprotestingatEnglishWikipediabroughtmeasurableresults,1.___
[originaltext]W:Iwonderifthere’sadifferenceinworkattitude--workingin
A.50mH B.75mH C.100mH D.125mH
施工单位可以根据实际情况进行修改、调整专项方案进行组织施工。
风险识别是在风险分析的基础上,采用定性和定量相结合的方法,按照风险发生的可能性及
建筑材料中,混凝土按功能分类属于( )。 A、隔热保温材料 B、防水材料
一台三绕组变压器绕组间的短路电压分别为UdI-Ⅱ=9.92%,UdI-Ⅲ=15
按照施工合同示范文本的规定,发包人收到竣工结算报告及结算资料后56天内仍不支付结
最新回复
(
0
)