首页
登录
职称英语
All the preparations for the task______, and we re ready to start.A、completedB、
All the preparations for the task______, and we re ready to start.A、completedB、
游客
2023-09-19
35
管理
问题
All the preparations for the task______, and we re ready to start.
选项
A、completed
B、complete
C、have completed
D、have been completed
答案
D
解析
本题考查现在完成时的被动语态。表示已经发生的动作对现在产生的影响时,应用现在完成时态。All the preparations和complete之间是被动关系,所以应用被动语态,因此空格处应用现在完成时的被动语态,所以答案为D)。
转载请注明原文地址:https://tihaiku.com/zcyy/3026657.html
相关试题推荐
Allthepreparationsforthetask______,andwe’rereadytostart.A、completedB、
Itwassuggestedthattheconstruction______aheadoftime.A、iscompletedB、wasc
Allthepreparationsforthetask______,andwerereadytostart.A、completedB、
Itwassuggestedthattheconstruction______aheadoftime.A、iscompletedB、wasc
Allthepreparationsforthetask______,andwerereadytostart.A、completedB、
Itwassuggestedthattheconstruction______aheadoftime.A、iscompletedB、wasc
Itwassuggestedthattheconstruction______aheadoftime.A、iscompletedB、wasc
Itwassuggestedthattheconstruction______aheadoftime.A、iscompletedB、wasc
[originaltext]Lifeinthetwentiethcenturymustdemandpreparations.Today
[originaltext]Lifeinthetwentiethcenturymustdemandpreparations.Today
随机试题
AimingtoretrievetheMarsroverOpportunity,engineersareimitatingMarssurf
Manyparentsmaythinkthateachnewsibling(兄弟姐妹)offerstheirchildrenthe
模板安装高度超过3m时,应符合()。A.上层支架立柱应对准下层支架立柱 B.
图示圆轴,在自由端圆周边界承受竖直向下的集中力F,按第三强度理论,危险截面的相当
适用于"从治"的是()A.寒者热之 B.实者泻之 C.热者寒之 D.
对设计技术与工程进度的关系作分析比较,这项工作的主要时间段在()。A、施工准
血栓闭塞性脉管炎局部缺血期的特征性临床表现是A:静息痛 B:肢体坏疽 C:间
商业银行外汇交易的主要业务品种有()。A.即期外汇交易 B.择期外汇交易
某国对外开放程度和外贸依存度都较高,国际融资尤其是短期融资规模相对较大。该国货币
影响工程进度的因素中,施工安全措施不当属于( )。A.业主因素 B.施工技术
最新回复
(
0
)