首页
登录
职称英语
Water power stations are built______big waterfalls and where the water runs fast
Water power stations are built______big waterfalls and where the water runs fast
游客
2023-09-19
35
管理
问题
Water power stations are built______big waterfalls and where the water runs fast.
选项
A、which are
B、which has
C、where there have
D、where there are
答案
D
解析
本题考查状语从句。分析句子结构可知,空格所填词应和big waterfalls…fast一起构成状语从句,空格前没有表示地点的先行词,因此从句的引导词应用where。表示“哪里有什么”应当用there be结构,且空格后为复数名词big waterfalls,故be动词为复数形式。因此答案选D)。
转载请注明原文地址:https://tihaiku.com/zcyy/3026528.html
相关试题推荐
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt________bigwaterfallsandwherethewaterruns
随机试题
AmongthegreatMiddleEnglishpoets,GeoffreyChaucerisknownforhisproducti
Oneofthemostimportantfeaturesthatdistinguishreadingfromlisteningi
MOLLIFY:A、instigateB、instillC、ireD、subsideE、combatC
RobertBrowning’sprincipalachievementliesinhisintroducingtoEnglishpoetr
Thetrulyincompetentmayneverknowthedepthsoftheirownincompetence,a
除《哲学的贫困》外,标志马克思主义公开问世的经典著作是()A.《关于
真菌人工培养的条件,正确的是A.培养基中必须含有丰富的营养物质 B.最适pH7
下列关于勘察与设计的说法,正确的有()。A、建设工程的勘察与设计是两类性质相近但
根据《中华人民共和国放射性污染防治法》,核设施营运单位应当建立健全安全保卫制度,
(2021年真题)下列条件中,属于线性盈亏平衡分析模型假设条件的有()A.
最新回复
(
0
)